Laserfiche WebLink
i <br />No Pre-test Required <br />Final Test: <br />Scheduled Date: 08/18/09 <br />Start Time: 8:00 am <br />Estimated Station Down-time: 6 hours <br />Testing Contractor: <br />Alltech Petroleum <br />Phone: (209) 532-7320 <br />"Ufl.l I UkUL.UG1 Allll S..4V11P G.,M.I G111SG/Ulldl"1 UV.V 1VM11WCa/oLU1UJ l X 1 <br />is <br />Fuel Buyers — Please Ensure The Following Requirements Are Met: <br />ULLAGE: The combined maximum uilage CANNOT exceed 25,000 gallons (see attached worksheet <br />for calculating the total ullage) . <br />a FUEL INVENTORY: Total fuel inventory must be 60% of total capacity prior to the test(s). <br />FUEL DELIVERIES: No fuel deliveries can be made during testing activities. Latest fuel delivery time <br />is 6:00 am on 8/18/09 <br />STATION DOWN TIME: Please factor the down-time provided above into the delivery schedule. <br />Gas Station Supervisor — Please Ensure The Following Requirements Are Met. <br />I SITE .ACCESS: Please provide access to Fuel Hut, Fuel Tanks, and Dispensers (do not lock dispenser <br />j nozzles). <br />FILTER CHANGE: If you have a filter change scheduled, it would be better to perform this service <br />before the test rather than after. <br />'Warehouse Manager ! <br />'Please be aware that an inspector from the environmental oversight agency may be on site to witness <br />the test and inspect the underground storage tank system. <br />j Thanks, <br />Mike Dotten <br />A.11tech .Petro Inc. <br />2 oft <br />8/19/2009 1:46 All <br />