Laserfiche WebLink
UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />its / �/ .1 , I1 <br />Inspection date: <br />SAN JOAQUIN COUNTY <br />4 1 mo*tv" <br />Service Request #: <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />�. <br />Icervice Technicianllnstaller Exp. Date: <br />3 � 4 III I <br />600 East Main Street, Stockton, CA 95202-3029 <br />Leak detector <br />❑ <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />.: <br />1 <br />� �iA 1 f <br />❑ electronic Serial #-. <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />its / �/ .1 , I1 <br />Inspection date: <br />Facility Addr�es�s: �� y <br />�4�.l"[Dot �v� <br />4 1 mo*tv" <br />Service Request #: <br />Onsite Service Technician's Name: dd - <br />� G <br />Icervice Technicianllnstaller Exp. Date: <br />3 � 4 III I <br />Manufacturer Training: <br />la, <br />SERVICE <br />its / �/ .1 , I1 <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />'� % /r <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />.: <br />1 <br />� �iA 1 f <br />❑ electronic Serial #-. <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />L❑ <br />electronic Serial #: <br />❑ line_ test programmed <br />sensor AW kh S <br />El positive shutdown Model: _Q I <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1 } <br />SERVICE <br />its / �/ .1 , I1 <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />'� % /r <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT <br />Caldwell System ❑ Other <br />.: <br />1 <br />� �iA 1 f <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />L❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note, Please be aware that 2° containment components are required to be tested upon <br />installation, & months after, and every 35 months thereafter. <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />i �� . ► LL� a'�. �% 1� ■, 1 d 11I : �� <br />its / �/ .1 , I1 <br />�:+i�. I '_, <br />a.' 6 1 a i �• 1 KI '. <br />'� % /r <br />FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT <br />EHD'S CURRENT <br />HOURLYTHIS <br />.: <br />1 <br />� �iA 1 f <br />4W <br />M AR M <br />A <br />EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br />Rev 11/171108 <br />