Laserfiche WebLink
I ` � <br />W. L. BUTLER . Tran ttal Page 2 of 2 <br />Construction, Inc. Project <br />( -Costco New Warehouse <br />(Manteca) <br />Store # 1031 <br />Architects Project 06-0428-01 <br />W. L Butler Construction, Inc. <br />2440 Daniels Street <br />Manteca, CA 95336 <br />Phone: (209) 823-0591 <br />Fax: (209) 823-0712 <br />To Muniappa Naidu <br />San Joaquin County Health Department <br />600 E. Main Street <br />Stockton, CA 95202 <br />USA <br />Phone: (209) 468-3420 <br />Fax: 209-468-3433 <br />From Kara Stein (W. L. Butler Construction, Inc.) <br />Subject Final Inspection Request <br />Date 7/28/2008 <br />Items listed are being sent <br />9 Enclosed <br />177 Under Separate Cover <br />Via Fax <br />Transmittal No. 71077- <br />611 <br />CSI Code 13200 - Underground Fuel Storage <br />cc Rick Dion (W. L. Butler Construction, Inc.), Matt Nevens (W. L. Butler Construction, Inc.), Mr. Mike Newland (W. L. Butler <br />Construction, Inc.) <br />We are transmitting the following to you: <br />17 Product Data ❑ Samples <br />1-7 Architectural Drawings (� Shop Drawings � O&M Manuals �r <br />�- Letters Plans <br />j7 Engineering Drawings � Specifications C Prints <br />Change Orders ❑ Submittal r Addenda <br />�1 Inspection Request <br />Remarks Muniappa, <br />As previously discussed, the final inspection for Costco Manteca Gas Station will be scheduled for Tuesday, 8/12/08 at 9:00AM. Tanknology <br />will also be onsite for the inspection. <br />Feel free to contact me with any questions. <br />Thanks, <br />Kara Stein <br />Project Engineer <br />W. L. Butler Construction, Inc. <br />204 Franklin Street <br />Redwood City, CA 94063-1929 <br />650.361.1270 main] 650.361.8657 fax <br />650.568.5419 direct <br />650.743.0414 cell <br />www.wlbutler.com <br />BUILDING OUR CLIENT'S VISION <br />Redwood City I Stockton I Irvine I Palm Desert <br />Distribution <br />Nevens <br />Dion <br />Butler Construction, Inc. <br />Butler Construction, Inc. <br />Butler Construction, Inc. <br />22u County Health Del <br />3utler Construction, Inc. <br />3utler Construction. Inc. <br />ail: <br />Fax: <br />RECEIVED <br />JUL ? 8 2008 <br />SA "O"u,„ ry i=VUruTY <br />PGN!Ir, i;jv rF i_ <br />HEt1L7h U�1-iihPTMENT <br />in <br />