Laserfiche WebLink
/.1 I <br /> 13. TANK(s) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic. . <br /> B. Holiday test required immediately before "setting" tank(s) (35,000 - <br /> 40,000 volts). [Section 2635 (b) (4)] <br /> <: d <br /> •1 <br /> – C. Fiberglass ( ctions 2635 (3) and 2631 (p)] <br /> (1) Stri plate dimensions and materials. ;. <br /> (2) Striker pla under all accessible openings. <br /> �• ,a <br /> (3) Installation inst ctions require an air test and soap <br /> test prior. to ' stallation. ..Y <br /> L. —•.v <br /> 'fl <br /> D. Non-clad s 'el tank [Section 2635 (b)] <br /> — (1) Ca odic protection provided for entire tank, piping and f <br /> comp cnts (nuts, bolts, washers, etc.). <br /> 2 A roved a corrosion engineer or N.A.C.E. =`1 <br /> ( ) pP g <br /> technician. <br /> 't'�: <br /> (3) Document stating insp tion method and frequency. <br /> (minimum semi-annual ins ction requirement). <% <br /> J7 <br /> E. Other types of ks. `s <br /> (1) Chemical con sition of material stored is provided. <br /> (2) Chemical abstract service n (CAS#) <br /> 14. Overflow protection systems (detail drawing of spill catchment basins)/piping <br /> sump(s) required, including tank fill and all openings). [Section 2635 (b) (8)] <br /> A. Spill catchment basin. <br /> Capacity. ,Ci&L <br /> g <br /> Type: ° r� - ` <br />