My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
12145
>
2300 - Underground Storage Tank Program
>
PR0508337
>
INSTALL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:28 PM
Creation date
11/4/2018 3:01:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0508337
PE
2361
FACILITY_ID
FA0008040
FACILITY_NAME
SAN JOAQUIN AIR
STREET_NUMBER
12145
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
952429541
APN
05518005
CURRENT_STATUS
02
SITE_LOCATION
12145 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DE VRIES\12145\PR0508337\INSTALL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. Secondary container(s) thickness, density, composition, product compatibility. o <br /> Sized to contain unauthorized releases from primary containers to allow <br /> sufficient time for detection and removal. [Section 2631 (c)] a� <br /> 21. Secondary container(s) volumetric requirements: [Section 2631 (e) (1) <br /> and (2)] "A:: . <br /> - ;b <br /> F•,."�. <br /> A. Sin primary containers = 100%. <br /> B. Multiple ' rimary containers = 150% of largest primary <br /> t container 10% above aggregate. '' <br /> 22. Secondary contain (s) open to rainfall. [ Section 2631 <br /> Volumetric re ireme Its = 24 hours of 100 year storm in addition to <br /> primary contain r volumes. <br /> vt <br /> 23. Secondary container floor. [Section 2631 (i)] `1 <br /> A. Constructed on firm base. <br /> B. Sloped to collection sump ( 1/3 inch per foot). <br /> (1) One or more access casings installed in sump { <br /> (a) Size to allow removal of collected liquid. <br /> (b) Extended to ground surface. <br /> (c) Covered with a locked waterproof cap or <br /> within a secured facility. <br /> (d) Thickness allows for anticipated stresses. <br /> (e) Construction materials are not weakened <br /> stored product or will not donate, capture, ` <br /> or mask constituents to be monitored. <br /> 24. -Membrane er specifications. [Section 2631; k, 1, and m] ' <br /> y .Ea� <br />
The URL can be used to link to this page
Your browser does not support the video tag.