Laserfiche WebLink
8. a. Describe the method that will be utilized to purge andlor Inert the tank(s): <br /> b. TanklPiping Hauler: <br /> Name ''// ���QQ ��(1P )0C LnL• <br /> Address,5-/0 � Citq� Z1pyV&35 <br /> Phone No.(—�09 <br /> Hauler Registration N Of hauled as hazardous) <br /> C. TanklPlpiug Disposal Site: <br /> �ast�rnsf. �o + <br /> Name <br /> Address /c��I S,Len e- d city TL/cck ZIP-25 38 I <br /> Phone No.( aO9 ) (sCoB 9 3 � <br /> BPA HAY(if transported to a permitted TSD facility) e/-) <br /> 9. Is the sampling firm an independent third party from the contractor? YES'Q NO(J <br /> 9a. Describe,In detail,bow the soil andlor water sample(s)beneath the tank and piping will be obtained: <br /> 10. Describe how the excavation will be baekflDed with suitable material upon removal• <br /> P ,o- t -�7--�-- ,_ �11omi;v3-k �vn xtjr- k)/o x�i r>.e �c��'C M;pi)/, (P l�iiCS. <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> U)5211P� 0n . <br /> b)What will be the final destination of the excavated stockpile? <br /> o x .n.pa I-A .`A-j L 1,S YJol Ccn4ayl, xkdaC d 0/ b2 <br /> U�ecl �o .bQ�lc ll,CL/ow•�h ��9�a�c. <br /> c)Contaminated Soli Hazardous Waste Hauler <br /> Name �� �} Hauler Registration/ <br /> Address city Zip <br /> Phone No.( ) <br /> EH 23 046(Revise d 09113199) Page 5 <br />