My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DOUGLAS
>
1807
>
2300 - Underground Storage Tank Program
>
PR0231078
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 3:04:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231078
PE
2381
FACILITY_ID
FA0003905
FACILITY_NAME
PAIGES TOWING
STREET_NUMBER
1807
STREET_NAME
DOUGLAS
STREET_TYPE
RD
City
STOCKTON
Zip
95207
APN
09721019
CURRENT_STATUS
02
SITE_LOCATION
1807 DOUGLAS RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DOUGLAS\1807\PR0231078\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ow <br />30 November 1998 <br />Im AGE -NC Project No. 95-0197 <br />Page 3 of 7 <br />5.0. PERSONAL PROTECTIVE EQUIPMENT <br />Based on evaluation of potential hazards, the following levels of personal protection have been <br />designated for the applicable work areas or task: <br />LOCATION: <br />JOB FUNCTION: <br />LEVELS OF PROTECTION: <br />Exclusion Zone <br />Drill borings <br />A B C D Other <br />Reduction Zone <br />Preserve samples <br />and log borings <br />A B C D Other <br />Support Zone <br />Support functions <br />A B C D Other <br />specltic protective equipment for each level of protection used is follows: <br />steel -toed boots <br />Level D: half -faced respirator (if necessary) <br />gloves <br />_ If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br />with the involved substances and concentrations. No down -grading changes of the specified levels <br />of protection shall be made without the approval of the site safety officer and the project team leader. <br />6.0. ON-SITE WORK PLAN <br />Work party(ies) consisting up to four persons will perform the following tasks: <br />PROJECT TEAM LEADER: <br />TASK: <br />Timothy J. Cuellar <br />Coordinate tank removal activities <br />FIELD CREW: <br />TASK: <br />Michael Rauser <br />Supervise excavation activities <br />Equipment operator(s) <br />I Operation of backhoe/excavator/loader/crane <br />.. The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br />Advanced GeoEnviron mental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.