regulations, list of contractors (in case leak detectors need to be installed), <br /> LG - 123 (discussing SIR) and a list of SIR companies. I asked Mr. Watkins <br /> to send me a copy of PT results or confirmation that test is scheduled by <br /> 2/8/93. Also, I asked that he send me a photocopy of SIR contract once <br /> he chose an SIR company. Mr. Watkins gave me his new home address <br /> as: 1115 Beelard Drive, Vacaville, CA 95687. 1 submitted a new State A <br /> form to reflect new address. <br /> 6/22/93 Phoned Bill Watkins at facility this date to ask about status of PT's, SIR, etc., <br /> as I had not heard from him. Mr. Watkins stated he has no money to do <br /> anything at this time. I indicated that I would have to start office hearing <br /> process to attempt to gain compliance. He stated "OK, do what you have <br /> to do". <br /> 7/28/93 A Notice of Administrative Hearing was mailed to Mr. Watkins at his Beelard <br /> Drive address. <br /> 8/11/93 Mr. Watkins attended the Office Hearing at PHS-EHD along with Doug <br /> Wilson, Margaret Lagorio and myself. Mr Watkins agreed to correct <br /> violations within 60 days (October 1, 1993). Mr. Watkins was given <br /> information on monitoring as well as contamination identified on the site. <br /> Mr. Watkins stated tanks were installed in 1985(?) (by Brad Frahm), and <br /> that he felt that the tanks did not leak. There were tanks on the site prior <br /> to the current tanks being installed. Mr. Watkins stated that he had been <br /> unaware of contamination on the site. <br /> 8/11/93 Placed Office Hearing agreement and meeting participation record in pink <br /> section of file, and accounting worksheet (paid) in green section of file. Per <br /> Mr. Watkins, tank and piping test scheduled for August 30 and 31. Ms. <br /> Lagorio informed us during the Office Hearing that both Mr. Watkins and <br /> Mr. Paige (previous property owner) are listed as responsible parties for <br /> property. Mr. Watkins informed us that he currently does not use tank #2, <br /> as it is regular gas. Mr. Watkins was informed that he must utilize and <br /> monitor both tanks (or remove them). Mr. Watkins indicated he would be <br /> using Shields and Harper with Enviroquest for his SIR. <br /> 9/15/93 Received and reviewed tank and line test results. All elements passed. <br /> Results indicate lines are suction and therefore do not require leak <br /> detectors. Now lack only SIR verification. <br /> 10/14/93 Phoned Bill Watkins to ask about status of SIR as I had not heard from him <br /> and it was now passed the Office Hearing deadline. He indicated that he <br /> was a little late, but that he had signed a contract and was waiting for it to <br /> be returned. He stated he would bring in photocopy of contract once he <br /> 2 <br />