My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1996-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 1996-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:00 PM
Creation date
11/4/2018 3:07:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1998
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 1996-1998.PDF
QuestysFileName
COMPLIANCE INFO 1996-1998
QuestysRecordDate
2/14/2018 5:41:15 PM
QuestysRecordID
3794377
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.14 <br /> ° <br /> �" n <br /> CHEVRON 92033 174705 . <br /> 508 W. CHARTER WAY ST�CKTON, CA 9520�- <br /> The followincn-� items must be signed for prior to starting tannd/or <br /> line testing at site: <br /> 1 ) The lccation reprzssntative un��rst��ds that P�I�R to �i��L �R��S t�e Unit <br /> Manager mus� stop t�s� in� and p� ace the compl �te ststion bac � into working <br /> order . <br /> 2) The location represenve ��de�st �nds ��at t�e puaps, �ls�e�ssrs and <br /> electrical supply must stay disa�� ed ����oughout the <br /> / <br /> 3) All as�ociated pnver breakprs �ave �een tsrned off for testi�g. <br /> 4) Magnetic signs have been p� ace� on powe� breaker boxes' <br /> 5) Out of Ce'vice bags are on dispense' nozzlas. <br /> 6) Padlocks are on dispaoser nozzles. <br /> 7) Check va� ve is c ] ose�. <br /> 8) Bayonet ccnnecto~ is d� sconnected �ro� p:m�F <br /> 9) All safety proce�ures here bee� discusse� with a1 ] sta� ion persocnel . The <br /> Location Representa� jva and TankncIogy Unit Mena�er have eac� confirmed <br /> that the Tag <br /> Cl Lockout procedurss are in effect . <br /> The Locaticn Representative agrees that the above items were explained <br /> and complete6 'pr J, 1, to the start of Tank and/or Line Tes� ing . <br /> Lo�a�inn �yyrpsenta�ie/� ��e� Lm. ���. S�qoa�u/e� Date/ <br /> � <br /> Unit Kuoager Namen �ce� <br /> PATRIC� PFRANG <br /> 1f"ll f, <br /> ' <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.