Laserfiche WebLink
I Monitoring System Certification <br />Site Address: <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />Co etc the fotlowin¢ checklist: <br />0 <br />Date of Testing/Servicing: <br />. In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: rZ C/7';- <br />Adle�c���tR ir'�f%Ci; <br />❑ No* <br />Is the audible alarm rational? <br />❑ No* <br />Is the visual alum rational? <br />❑ No* <br />Were all sensors visually ftioctionally tested, and confirmedoperational? <br />Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br />will not interfere with their proper operation? <br />❑ Yes <br />❑ Cyd* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g, modem) <br />O'N/A <br />pperational? <br />❑ Yes <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? if yes: which sensors <br />initiate positive shut -down? (Check all that apply) ❑ Sump/'Trench Sensors; ❑ Dispenser Containment <br />Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ❑ Yes; ❑ No. <br />Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />❑ N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />Q <br />fill im(s) and tin r ? If so, at what percent of tank capacity alarm trigger? the alartri ? ??TM/6C <br />❑ Yes* <br />o <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br />replaced and list the mamdacturer name and model for all replacement parts in Section E, below. <br />Yes* <br />❑ No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E. below. <br />❑ No* <br />Was monitoring stem set-up reviewed to ensure proper settings? <br />es <br />❑ No* <br />Is all monitoring equipment 2pemonal r manufacturer's cations? <br />. In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: rZ C/7';- <br />Adle�c���tR ir'�f%Ci; <br />