My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 1999-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 12:55:50 PM
Creation date
11/4/2018 3:09:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2006
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 1999-2006.PDF
QuestysFileName
COMPLIANCE INFO 1999-2006
QuestysRecordDate
2/14/2018 7:25:41 PM
QuestysRecordID
3794706
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING AND RESPONSE PLAN <br />I UNDERGROUND STORAGE TANK MONITORING PROGRAM l_ <br />storing program must be kept at the UST location at all times. The information on this monitoring program are <br />Ins of the operating permit. The permit holder must notify Environmental Health Department, (209) 468-3420 <br />.30 days of any changes to the monitoring procedures, unless required to obtain approval or <br />Mange. Required by CCR 2632 (d) and 2641 (h). a permit before making <br />,'ACILITYNAME /.hGk7c2s uucVeC�7 DATECSs <br />oC% <br />FACILITY ADDRESSS DCyGtx 7Pe C Kyo N r q <br />o . <br />1.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />2.Describe the frequency of performing the monitoring for: <br />TANKS PIPING A» »Ur / <br />3.Describe the location(s) of where the monitoring will be performed. ie: location ofsensors <br />4.Describe the following equipment for each underground storage tank. <br />Name and Model of Monitoring Panel V f ( & P e 11k UO 1 /Z'S <br />Name and Model of Line Leak Detectors FF7p r-10 YYt i r_/ <br />Name and Model of Annular SensorsC_6/ 1e <br />Name and Model of Piping Sensors <br />Name and Model of Dispenser Sensors _/EP%F 6h' p6lc '- <br />Type of overfill prevention -222 [2C y6�7 i Cc. r2 <br />S.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? <br />Yes U/ No 0 <br />Does the turbine shut down if a sensor is disconnected? <br />Yes 13" No ❑ <br />Does the turbine shut down is the monitoring panel loses power? <br />Yes 9' No ❑ <br />6. How will the alarm history and subsequent maintenance be recorded? <br />7 -Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? "f6l <br />s <br />Note: For new installations the secondary containment must be tested 6 months after installation. All secondary containment systems <br />must be tested once every 36 months with initial testing performed before January 1, 2003. <br />8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />equipment._ j)r I?A. /ib C'n car 4, t... <br />1AUnit IInUSTTmonitoringplan.dm <br />42/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.