My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 1999-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 12:55:50 PM
Creation date
11/4/2018 3:09:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2006
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 1999-2006.PDF
QuestysFileName
COMPLIANCE INFO 1999-2006
QuestysRecordDate
2/14/2018 7:25:41 PM
QuestysRecordID
3794706
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1l <br />D. Results of'l'esting/Servic•ino <br />— <br />Software Version Installed: <br />Ces ❑ No* Is the audible alarm o erauona, <br />(es ❑ No* Is the visual alarm operational'? <br />(es ❑ No* Were all sensors visual) ins ected, functional) tested, and confinned o eralional'? <br />ees ❑ No* Were all sensors installed at lowest point of secondary containment nod positioned so that other equipment will <br />not interfere with their m er o enation? <br />Yes ❑ NO* If alarms are relayed to n remote monitoring station, is all communications equipment (e.g. modem) <br />f( N/A operational? <br />Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down'? (Check all that apply) R sunp/french Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm ositive slut -down due to leaks and sensor failure/disconnection- ov? es; ❑ No. <br />Yes ❑ No* For tank systems that I'll 17e the monitoring sysis'l, as tile the overfill primary <br />warn warningalarm visible and audible t the tank <br />O N/A mechanical overfill prevention vank <br />lve is installed), % <br />611 oint(s) and operating ro erl ? If so, et what percent of tank ca acit does the alarm tri er7 <br />Yes* 9`F 0 Was any monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement Earls in Section E, below. <br />Yes* Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br />n <br />Product; ❑Water. if es, describe causes in Section E, below. <br />__. •._ _--_ _.._.e... tee, �,,, ,Pviewed to ensure proper settings? Attach set up reports if applicable <br />allou.... .. -- -- - <br />Yes ❑ No Is all monitoring equipment operational per mann acturer s specs tc <br />* In Section E below, describe how and when these defactenctes were or wdl be corrected <br />E. Comments: <br />page 2 of 3 <br />03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.