My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 1999-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 12:55:50 PM
Creation date
11/4/2018 3:09:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2006
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 1999-2006.PDF
QuestysFileName
COMPLIANCE INFO 1999-2006
QuestysRecordDate
2/14/2018 7:25:41 PM
QuestysRecordID
3794706
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Resultsof'1'esting/Servicing <br />Software Version Installed: ---L2i. _ <br />Ves ❑ No* Is the visual alarm lope rauuua. -- <br />Yes ❑ No* Were all sensors visual) ins ected, functional) testeJ, and confinired o erational7 <br />Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their ro er o eration? <br />Yes ❑ J>le" 1f alarms are relayed to a remote mmtitoring station, is all communications equipment (e.g. modem) <br />C'l N/A operational? <br />Yes O No* For pressurizer) piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all dmr apply) ajulop/Trench Sensors; ❑ Dispenser <br />r Containment <br />nt Sensors. <br />Did ou confirm positive shut -down due to leaks and sensor failure/disconnection. <br />Yes ❑ No* For lank systems that utilize the monitoring system as the primary tank overfill warning device he. no <br />O N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible end audible at the % <br />fill oint(s) and o eratin ro erl ? If so, at what ercent of tank capacity does the alarm tri _, <br />Yes* B"Flo Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all re lacement arts in Section E, below. <br />Yes*o Was liquid (Quad inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br />Product; ❑ Water. if yes, describe causes in Section E, below. <br />—t_aa reviewed to ensure proper settings) Attach set up reports e <br />if applicabl <br />Yes ❑ No* I is all monitorm e m 3111CIlL -• - ---- <br />* [n Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: - - —_ — <br />03081 <br />Page 2 of <br />'r <br />
The URL can be used to link to this page
Your browser does not support the video tag.