Laserfiche WebLink
• i - <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />TYPE OF ACTION 5. I. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />Mol. <br />PLAN TYPE Id MONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. <br />M02. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br />I. FACILITY INFORMATION <br />FACILITY TD 4 (Agency Use Only) <br />FACILITY NAME <br />Moa. <br />FACILITY SITE ADDRESSQar�a M04. <br />CITY ?� <br />dMos. <br />IL EQUIPMENT TESTING AN0 PREVENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g, sensors, probes, line leak detectors, etc.) be performed in <br />1106_ <br />accordance with the equipment manufacturers' instructions, or annually, whichever is mom frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED W 1. ANNUALLY ❑ 99. OTHER (Specify): <br />"101. <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e, location of each sensor, <br />line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />form, Iimixfous Materials Business Plan map, etc.) which shows all required information, include it with this Film. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />Mlo. <br />1. CONTINUOUS ELECTRONIC MONITORING OF OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS: a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />On <br />Mu <br />PANEL MANUFACTURER: ye e d it R O d 7 M12. MODEL #: -r,4 S. ?.SD <br />M13. <br />LEAK SENSOR MANUFACTURER: f / 'e / o, M14. MODEL #(S): anl�_g' Al d <br />M15. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: M16. MODEL #: <br />Mn. <br />IN -TANK PROBE MANUFACTURER: Pont MODEL #(S): <br />M19. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): M22. <br />M23. <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />M24. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ & ANNUALLY ❑ b. BIENNIALLY ❑ e. OTHER (Specify): M26. <br />M T <br />❑ 6.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requbes agenq approval) <br />❑ 99.OTHER (Specify): <br />Meg_ <br />V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />M30 <br />LX1, CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: JAI. a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />'e'" <br />PANEL MANUFACTURER: V9 B (I e e I c OO T M32- MODEL #: rL s- L S 6 <br />W3. <br />LEAK SENSOR MANUFACTURER: i Y /,, // M34_ MODEL #(S): 2 A J' <br />Mas. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? ❑ a. YES ❑ b. NO <br />M36. <br />WILL FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M32 <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MELD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED q <br />MJ8 TLS SO <br />M39. <br />MLLD MANUFACTURER(s): MODEL #(S): . d <br />19 3. ELECTRONIC LINE LEAK DETECTOR (ELLD THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />FELL, MANUFACTURER: VEFI , It %1007, Moo MODEL#: <br />M41, <br />PROGRAMMED LINE INTEGRITY TESTS: at a. MINIMUM MONTHLY 0.2 g.p.h. 10 b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? X a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILUREMISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? @j a. YES ❑ b. NO <br />M44. <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) Mas. <br />M46. <br />❑ 5.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY- ❑ C. MM. MONTHLY & EACH TIME SYSTEM OPERATED** <br />M47. <br />' Requiresagenq*pmval " Allowed for monitoring of unburned emergency generator fuel piping only per HSC §15281.5(b)(3) <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />M48. <br />SJCEHD-d (07/03) - 1/4 0723/03 <br />