Laserfiche WebLink
0 <br />1-1 <br />L <br />S%VRCB, January 2002 <br />Page3—of <br />S. SECONDARY PIPE T PING <br />4 <br />Test Method Developed 0 Piping Manufacturer 2Industry Standard 0 Professional Frigineer <br />0 Other (Sped) <br />Tsi Method Used: 0 V----;� <br />0 Other ('specify) <br />Tos(Eqaipment Used: <br />5' <br />Equipment Resolution: <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping Run # <br />Piping mawrial: <br />6r <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />an '44- <br />a�, <br />Product Stored: <br />.5�� <br />Method and location of <br />piping -run isolation: <br />Wait thrie between applying <br />pressureA acuumAxater mid <br />starting test: <br />Test Start Time: <br />'14,--) <br />25 <br />Initial Reading ft <br />Test End Time: <br />Final Reading (RL,): <br />Test Duration: <br />Change im Reading (RF -N: <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />YPass D Fad <br />11 Pass Aail <br />VPass 0 Fad <br />0 Pass D Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow -Me for failed tests) <br />