My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:12 PM
Creation date
11/4/2018 3:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
2/15/2018 12:34:40 AM
QuestysRecordID
3795241
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,17/17/2008 08:24 Is 640138 ENVIRONME* HEALTH PAGE 03/07 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans &applications as originals will be retained by EHD) <br /> 1. Site map enclosed YES[] NO K--� <br /> 2 Manufacturer's spec sheets attached for all equipment to be installed YES (] <br /> 3. Description of work to be completed (If adding piping. UDC's,or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 41-,4 as necessacy for a ti i plan review): <br /> 43 ti <br /> }� .. <br /> CesrpTiontof eaui e t o e used (At�.h raw'ng ue Hots a necess ry <br /> 3� c� Wit t <br /> 5. All equipment is State certified or approved. YES WIND[] <br /> 6. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO[] r{ <br /> b. Identify contractor perfgrming deconteminatigqn: <br /> Name t .l n Phone(`) <br /> Address r City Zip <br /> c. Describe method to be used for decontaminetjon: <br /> ttiZ <br /> d. Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> h <br /> e. Rlnsate Hauler and permitted Treatment, Storage& Disposal Facility; <br /> Hauler Name Phone(_ Hauler Reg# <br /> Address fik City Zip <br /> Permitted Disposal Site <br /> 7. a. Describe the method that will be utilized to purge and/or inert the piping; <br /> b. Piping Hauler; <br /> Name Phone(_ <br /> Address Citv Zip <br /> Hauler Registration#(if hauled as azardous) <br /> c. Piping Disposal Site r <br /> Name Irl 1 Phone �) <br /> Address City Zip <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 8. is the sampling firm an independent third party from the contractor? YES[] NO[] Ai//4 <br /> 9. Describe, in detail, how the soil and/or water sample(s)beneath the piping or dispenser will be obtained: <br /> 10. Handling of excavated soil (C ntaminated Lil Hazardous Waste Hauler): <br /> Name Hauler Registration# Phone <br /> Address City Zip <br /> b)If soil is not to be hauled, describe what will be done with it: <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.