Laserfiche WebLink
Nov 14 12 11:41a Reliable PetroleurnA 209-845-8953 p•4 <br /> Monitoring System Ce fication • • <br /> F. In-Tank Gaugin I SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be ompleted if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following heckbst: <br /> ❑ Yes I ❑ No* Has 11 input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Wer all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Wer all probes reinstalled properly? <br /> ❑ Yes ❑ No* Wer all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H. belov describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detect rs (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followinecklist: <br /> ® Yes ❑ lto* For quipment start-rip or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑ N/A (C k all that apply) Simulated leak rate: ®3 g.p.h.; ❑0.1 g p.h; ❑ 02 g p b. <br /> ® Yes ❑ No* Wer, all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was he testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For i techanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ® NIA <br /> ® Yes ❑ No* For i lectronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ® Yes ❑ No* For ectronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or di connected? <br /> ® Yes ❑ No* For lectronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malf nctions or fails a test? <br /> 2 Yes ❑ No* For ectronic LLDs,have all accessible wiring connections bccn visually inspected? <br /> ❑ N/A <br /> 0 Yes ❑ No' IWen all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,belori describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />