Laserfiche WebLink
y <br /> �. VM1 <br /> Vaporless Manufacturing, Inc, <br /> Quality Petroleum Equipment <br /> Solutions for Over 20 Years <br /> LDT-890 Test Form&VMI Warranty Checklist <br /> n <br /> October 1 ,2006 <br /> Test Information <br /> Date: 10/22/08____ Test Company: EPIC Compliance Systems, Inc. <br /> Telephone: 209-465-3440_ Contact : Maria <br /> Site I.D: Charter Way Chevron Address: 508 Charter Way <br /> City: Stockton State: CA Zip: _95206 <br /> Type of Test Equipment: LDT-890 <br /> Submersible Pump Identification <br /> MFG: FE PETRO Model No: STPR150-VL2 Serial No: KH 1198 <br /> Leak Detector Identification <br /> MFG: Veeder Root Model No: PLLD Series 8484 Serial No: 233659 <br /> Replacement Leak Detector Identification <br /> MFG: Model No: Serial No: <br /> Line Conditions <br /> 1.Type of Pipe: FG 2. Diameter of Pipe: _2" _v. 3. Length of Pipe: 350' <br /> 4. Burial Depth of Leak Detector: _-3' 5.Kind of Fuel: Diesel 6.Date of Last Line Test:_ - <br /> Test Conditions <br /> 1.Operating Pump Pressure: 33 2.Gallon per hour test rate: 3 @ 10 psi <br /> 3.Static Line Pressure(Pump Off): -22-. -___ 4. Bleedback Test(Pump Oft):_10 ml. <br /> 5.Step-through time to full flow N A seconds(0 psi.to full pump pressure, no leaky <br /> 6. Leak detector stays in Leak Search Position with a 3 GPH leak-Yes: N/A PASS No: _ FAIL <br /> 7.Was the leak detector adjusted-Yes: No: X <br /> PLLD shut down line when leak was detected Pass <br /> Symptoms <br /> 1.Won't find 3 GPH leak: 2.Stays in Slow Flow: <br /> 3.Other: <br /> ************ If This Unit Is Returned Under Warranty Please Complete The Following <br /> Va orless RGA#: Return B (Company): _., <br /> P Y <br /> Telephone: ___ _.. - - Contact: <br /> Customer Control#: Address: <br /> City:Ci ----------- State: - -_._— ip=._...-- -- <br /> (See Website-www.vaporless.com -Technical Bulletin 032805) <br />