Laserfiche WebLink
t <br /> SAN JOAQUIN*UNTY ENVIRONMENTAL HEAL l H ltJ&x tvir-i., <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> Mal. <br /> TYPE OF ACTION ❑ 1.NEW PLAN [12.CHANGE OF INFORMATION <br /> Maz. <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - <br /> Mo3.- <br /> FACILITY NAME '� <br /> FACILITY SITE ADDRESS ° CITYLo <br /> Mos. <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc-)be performed in Mob. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED g L ANNUALLY E] 99.OTHER(Specify): M07 <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS; ;g DRY ❑ b.)LIQUID FILLED ❑ c_UNDER PRESSURE ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER: M12. MODEL#: <br /> LEAK SENSOR MANUFACTURER: aa14. MODEL#(S): Mss. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TAS <br /> PANEL MANUFACTURER: MLa. MODEL#: ML7. <br /> IN-TANK PROBE MANUFACTURER: Mlg. MODEL#(S): M19_ <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h_ ❑ b.0.2 g.p.h. ❑ c.OTHERM22. M73 <br /> (Specify): <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> M24. <br /> 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR¢2645 <br /> TESTING PERIOD: Ela.36 HOURS ❑ b.60 HOURS Mzs. <br /> ❑ S.INTEGRITY TESTING PER 23 CCR§26411 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY E] c.OTHER(Specify): M26 M27 <br /> ❑ 6.VISUAL MONITORING DONE: 0 a_DAILY ❑ b.WEEKLY(Requi-agency approval) <br /> MZg <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> kif t.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a�RY K LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> �/ M32. MODEL#: M33. <br /> PANEL MANUFACTURER: e D {y <br /> LEAK SENSOR MANUFACTURER: f/ M34 MODEL#(S): 0t] Mas, <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ❑ b.NO <br /> M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M37. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 gp.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED - <br /> MLLD MANUFACTURER(s): Mag. MODEL#(S): M39. <br /> g 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT UTINEJ�Y PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER:-OE 4 M4°. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. El b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ff a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURFJDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b_NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY` ❑ a.ANNUALLY C1 b.EVERY 3 YEARS ❑ c.OTHER(Specify) Mos. Moe. <br /> ❑ $.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED. M47. <br /> -Requires agency approval "Allowed for monitoring of unburied emergency generator fuel piping only per HSC 12526 L.S(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) M48 <br /> ❑ 99.OTHER(Specify) <br /> 07/23/03 <br /> SJCEHD-d(07/03)-1/4 <br />