Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FOJW <br /> UNDERGROUND STORAGE TAMC <br /> MONITORING PLAN (Page 2 of 2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING TRE FOJADWING METHOD a90' <br /> [ 4sasw <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑d.NO DISPENSERS ❑99.OTHER S - ): <br /> PANEL MANUFACTURER: Q 4sm55 MODEL#: 4vas5 <br /> LEAK SENSOR MANUFACTURER, 49 MODEL AS): 490'56 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES fff,/.NO 4so.sv <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a YES lyoul.NO 4— <br /> FAILURE/ <br /> 9o{i0 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. �❑ YES pj b.NO 49 1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER LW a.YES ❑b.NO 4"4iz <br /> 2.UDC CONSTRUCTION IS .SINGLE-WALL® ❑2 DOUBLE-WALLED 69043 <br /> IF DOUBLE WALLED: 4sas4e <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: I.LIQUID L3 2.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO 49a b <br /> VII.PERIODIC SYSTEM TESTING <br /> Ll 1. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED Acis'. <br /> MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. CCR 2644.1 <br /> CONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 40 <br /> SPILL BUCKETS ARE TESTED ANNUALLY. 4sob7 <br /> VIII.RECORDKEEPING <br /> The fg9gkowing monnoring/maimennue records are kept far this facility: <br /> IjKlarm logs 4sosaa ❑Visual Inspection Records 4vo.ass ❑Tank integrity testing results 4so.ssc <br /> �U SIR testing results(and supporting documentation records). 4so.sed ❑ Tank gauging results(and supporting documentation records). 4� <br /> ,,❑,r..,,ATG Testing results(and supporting documentation records).4soaan ❑ Comrsion Protection 60-day togs a4.-64QC//uipment maintenance and calibration records. 45 M <br /> IIL TRAINING <br /> ersormet with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49069a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> VS UNDERGROUND STORAGE TANK MONITORING PIAN(Required)49at9b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Requhed)4vobve <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4m <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4sa.bse <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4m-ssr <br /> ❑ S WRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"4w.6% <br /> OTINER(Specify):M49R Mont <br /> is facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will vain facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contactperson(s)for emergencies and monitoring alarms.4v 70 <br /> X COMMEDPIS(ADDITIONAL INFORMATION <br /> Provide additional comments a or into how malnyy pages with additional informti/on on spec.if1ic monitoring procedures a /�rt7gfhis Ian.Asan <br /> T,l�"e U�tr 7 �/7ealn j, u? Jobe VJI Ik Y) L'�NtCi J140'1 �6 <br /> / XL PERSONNEL RESPONSLBIL TIES <br /> The UST Owner/Operaaor is responsible for ensuring that 1)the daily/mutme UST monitoring activities and maintenance of UST leak detection equipment coveted by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained property. <br /> The folio (s)�rgta�omib for orming the memitoringand equipment martnaancc <br /> NAME U / L /D//t// 4un TITLE X 4so-re <br /> NAME a/ /L J — TITLE y-/, 4075 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owrKc/open stor,and inform the owner/operator of arty <br /> conditions that need follow-up action. <br /> XII.OWNERlOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided hnein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490,75 DATE: 4v 71 <br /> CC D I Ta� Ou ttttlxrt ❑ A �n>sd R q f Ocm /{ /f G <br /> APPLICANT NAME(print): J90•79 APPLICANTTITLE: 39�i9 <br /> UPCF UST-D(122007)314 <br />