Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE I One form thclli <br /> R01. <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID k (Agency Use NO 3. <br /> BUSINESS NAME(Same az FACILITY NAME) ,o <br /> 103. BUSINESS SITECCCY <br /> BUSINESS SITE ADDRESS ' �pC,('7p/!� <br /> D � <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unamhorized releaasa from UST systems and wpplements the emergency [..Pone Plans and Procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). shut-off,etc.)and,if necessary.safely remove <br /> i If safe to do so,facility personnel will take immediate measures to control of stop any release(e.g.,activate Pump <br /> remaining hazardous material from the UST system. ability conleutment system to <br /> 'r Any release to secondary containment will be pumped or otherwise removed within a time with Reovered fhazardousonm�at els,unless still suitable <br /> contain the hazardous material,but trot greater than 30 calendar days.or sooner fl"rcquved by agency. <br /> for their intended use.win be Managed as hazardous waste. a eable ills of hazardous materials. Absorbentm terfill nese with?CCR ch has become too sn lit finds ted to be <br /> hat <br /> "r Absorbent material will be used es contain for and clean ni oras g l labeled and pled container. Waste material shall be disposed of <br /> Absoeffecrivebent <br /> or which is it longer mended for use will be mansard a ble! waste unless a waste determination <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a property <br /> appropriately. <br /> az hazarrloas waste anluss a hazardous waste detennina[ion in accordance with 22 CCR <br /> 'r Facility personnel will determine whether any water renoved from secondary conWinmcat systertts, or from clean-up activity, has been m contact with <br /> hazardous material- If the water is contaminated, it will be managed petroleum layer may not <br /> §66262.11 fords that it is non-hazardous. If the water has a petroleum sbeen(i.e..rainbow colors),it is contatvinaced. A thick floating petro Y <br /> oion if any of the following conditions occur. <br /> as)from s•spill containcM etc.will not be disposed to storm water systems. <br /> necessarily display rainbow colors. Water(hazardous a ttoa-hazard <br /> We will review secondary contammenl systems for possible deterioratcontainment;I. Hazardous material in contact with see containment is Imo compatible with the material used for secondary <br /> econdary Containment; <br /> 2. Secondary containment is prone to damage form any cgmprrent used to remove or [ hazardous�edt l es containment <br /> �nmot to beat or neutralize <br /> 3. Hazardous material. other than the produadwaste stored m the Primary > tr containment <br /> released producUwasM and the added material or resulting material from such a combination is not ce l with secondary <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> ANCE:Spill conuol and clean-up equipment kept permanent oo-stte is listed in doe facility's Hazardous Materials Business Plan. This <br /> PERIODIC NAINITENes are replenished as seeded Defective equipment is repaired or replaced as necessary. <br /> egwpment Is usspected at Least monthly.amd after each use,supplies <br /> E UIPMENT NOT PERMANENTLY ON-SI BSL AVAILABLE FOR USE IF NEEDED: Com (e[e nnAVAILABILITY <br /> uo. <br /> EQUIPMENT Rzo. <br /> RIO. <br /> —1 3, <br /> �1. <br /> RI I. <br /> RS2. <br /> R22. <br /> R33. <br /> R3. <br /> RI3. <br /> R74. <br /> R24. <br /> R 14. <br /> RaS. <br /> Vs. <br /> RIS. <br /> IV. RESPONSIBLE PERSONS <br /> TILE FOLLOWING PERSONS)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: xso <br /> RCa. TITLE Of��G <br /> NAME S. <br /> Rot TITLE <br /> NAME �,` �ir?�//,O�r/—'iC psx <br /> Alf�Ll R42. gyTLE <br /> NAMER33. <br /> Rai. TITLE <br /> NAME <br /> V. MONUORING INDICATORS <br /> INSPECItON BY QUALIFIED PERSONS ❑3. RECALIBRATION OF EQUIPMENT <br /> [F MONITORING fNDICATFS A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE W lLL BE MADE AS FOLLOWS: R60 <br /> ❑I. ADDrFIONAL SYSTEM TESTING OR DATA COLLECTION �f <br /> ❑99. OTHER(SperirYT <br /> Rev."IM" <br />