Laserfiche WebLink
' STATE OF CALIFORNIA �A'�. "e o <br /> STATE WATER RESOURCES CONTROL BOARD u��, o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B ;n <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE TEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT //�� 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED o <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: A/ E' V <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.a B. MANUFACTURED BY: G/�.It,J UQ v <br /> C. DATE INSTALLED(MO/DAYNEAR) a /3 D. TANK CAPACITY IN GALLONS: Q <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A I MOTOR VEHICLE FUEL ❑ 4 OIL B`�p1' C. Imo. ie REGUWi UNLEADED ❑ 3 DIESEL ❑ 8 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY YV 1 PRODUCT / ib PflEMIUM UNLEADED ❑ d GASAHOL ❑ ] METHANOL <br /> ❑ 1C MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ BS UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ T ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED 95 UNKNOWN 99 OTHER <br /> COATING IS UNING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP <br /> d FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,etc. SPILL CONTAINME STALLED(YEAH) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO_ STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION U PRESSURE A U 3 GRAVITY A U 4 FLEXIBLEPIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL f U 2DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC) U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U T STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 01 MEIHA UNE UM 2 UNE TM,NTNE% ❑3 W WMUWS INTEmSIDIAL ❑4 ELEMONIC LME E 5 AUTOMATIC PUMP ❑ B9 OTHER <br /> pE1ECTOR TESTNO .."MmE1 IUK OR 4 ffl <br /> V.TANK LEAK DETECTION OS> > T <br /> ❑ 1 VISUAL CHECK ❑ 2 MANUAL RECONCILIATION <br /> ❑ ANNUALTANK <br /> 3 MONITORING ❑ 4 GAUGING MONITORING <br /> TANK ❑ 5 MONTORINGTER ❑6 TESTING <br /> �? MONITORING INTERSTITIAL ❑ 8 SIR ❑ 9 TANK GA TE❑10 MES TIN TANK ❑ 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUN1Y# JURISDICTION# FACILITY a TANK# <br /> m <br /> STATE 04 J S' a <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE Aj�-iuj <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THIVRGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />