My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 2:02:45 PM
Creation date
11/4/2018 3:15:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2016-PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016-PRESENT
QuestysRecordDate
2/15/2018 7:20:09 PM
QuestysRecordID
3795826
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/01/2006 09:59 707765990E RHL DESIGN PAGE 02 <br /> James H. Ray <br /> CIVIL ENGINEER <br /> 2041 Hidden Valley Drive <br /> Santa Rosa. CA 95404 <br /> 707480-8115 <br /> FEBRUARY 20,2006 <br /> S. Bravo Systems,Inc. <br /> 2929 Vail Avenue <br /> Commerce,CA 90040 <br /> RE: S'T'ATE REGISTERED PROFESSIONAL ENGINEER APPROVAL <br /> CCR Title 23 Division 3,Chapter 16,Section 2636(8) (2) <br /> BRAVO DISPENSER CONVERSION FRAME-MODEL CONV-B2000 <br /> This surface mounted dispenser anchorage frame adapts an existing installed under <br /> dispenser containment to a new dispenser. <br /> I have examined and reviewed the following items on the Bravo Dispenser Conversion <br /> Frame: <br /> 1. Bravo catalog sheet with specifications. <br /> 2. 132000 Conversion Frame Installation Instructions. <br /> Upon review of the materials and construction it is my opinion and conclusion that <br /> sound engineering design and engineering of the product provides an adapter that allows <br /> for the replacement of an existing dispenser leaving the existing under dispenser <br /> containment in place. <br /> James H..Ray <br /> Civil Engineer No. z°,sia <br /> Clvi� <br /> or <br />
The URL can be used to link to this page
Your browser does not support the video tag.