My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 2:02:45 PM
Creation date
11/4/2018 3:15:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2016-PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016-PRESENT
QuestysRecordDate
2/15/2018 7:20:09 PM
QuestysRecordID
3795826
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br />VIII. MONITORING SYSTEM AND PROGRAMMING <br />This section must be completed if a monitoring panel is used to perform leak detection monitoring. <br />Y <br />N <br />NA <br />Are the visual and audible alarms operational? <br />X <br />El <br />El <br />Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br />functionally tested, and confirmed operational? <br />[9 <br />❑ <br />❑ <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br />their proper operation? <br />FX1 <br />❑ <br />❑ <br />Was monitoring system set-up reviewed to ensure proper settings? <br />QX <br />❑ <br />❑ <br />Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? <br />0 <br />❑ <br />❑ <br />Does the flow of fuel stop at the dispenser if a leak is detected in the under -dispenser containment? <br />❑X <br />❑ <br />❑ <br />Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br />disconnected? <br />❑X <br />❑ <br />❑ <br />Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br />Which sensors initiate positive shut down? (Check all that apply.) Sump ❑ Under -Dispenser Containment <br />❑ <br />❑ <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />El <br />❑ <br />❑X <br />For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br />IX. COMMENTS <br />MIDDLE TURBINE DOES NOT COME ON SYPON ONLY. (87 -B) <br />X. IN -TANK GAUGING TESTING <br />❑ Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br />❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) <br />This section must be completed if in -tank gayRing is used to perform leak detection monitoring. <br />Y <br />N <br />NA <br />Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for <br />round faults? <br />X <br />❑ <br />❑ <br />Were all in -tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally <br />tested, and confirmed operational? <br />❑ <br />❑ <br />Was accuracy of system's product level readings tested? <br />Q <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />Q <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />R <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Q <br />1 ❑ <br />1 ❑ <br />For any answer of "N" above, describe in Section XI how and when these deficiencies were or will be corrected. <br />XI. COMMENTS <br />Y = Yes, N = No, NA = Not Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.