Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM <br />(Paye s of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: <br />If you already have a site plan that shows all required information, you may include it, rather <br />than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly <br />fd if l locations of the•folipwingMVipment, <br />if installed: 1) monitoring system control panels; 2) in -tank liquid level probes (if used for <br />le detection); 3) devices mrSnftodng tank <br />annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; <br />6) ev'ce's monitoring •vent piping, 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under -dispenser containment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />' E 6? 3 2018 <br />Monitoring System Certification <br />UST Monitoring Site Plan <br />i-l�r�iL�F i <br />— -- r---- ------- -- — —-------- -- <br />�{�1�F_a�1i%'tl <br />Site Address;_ ! Charter Way Chevron SOS W Charter Way Stockton, CA 93705 <br />r, OPA - •Mu" <br />I V 6 <br />KEY. <br />. . . . _ +PIPI7vC.V} <br />A=ANYiMAR <br />(ARRORrS) <br />F = FILLS . . . - TLS <br />lht <br />atvine of PPS <br />=PROBE BL�fE <br />Store <br />exit of sump and <br />PT=PRO <br />V = VAPOR <br />undyings <br />X= SUMP SENSOR <br />id <br />dram s <br />L =Leak Detector <br />accurate, We <br />AI=Xfanttazt <br />- -- - - <br />cannoec ate <br />- <br />B=BrineSan.;or <br />blue <br />blue prints. <br />las. <br />I = Smart Senior <br />S=$TP <br />C=Floats & Chain: <br />E = E stop <br />-- <br />1011. .. <br />.._. <br />r-- <br />JJC . ........ . .. . C .. _ .... - .. <br />87 <br />L <br />1111. _ <br />OA F <br />91 <br />87� <br />.__-1111.-1111.. <br />Charter Way <br />-'itlt• iferitt 111k rgroforlfitrd are 1rof{izibleto flY certjf•.ifiggitrialiClat? Ca -fa <br />peiJessirnnlopldcrranitnrrltresde(,fairjolnntioratl�npzs Drenrhg <br />not to acde <br />Data map was drawn t0-9-17 <br />lostruotions <br />If you alrea:P7 have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certsficatim, On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations o€the following equ;pment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other soccndary containment areas; machanicat of electronic lints leak date _tors; and indank liqu'd love! <br />probes (it used for leak detection). In the spsce provided, note the date this Site Plan was prepared. <br />LEGEND <br />