Laserfiche WebLink
San Joaquin County DIRECTOR <br /> Pp.Uiry Environmental Health Department Donna Heran,REHS <br /> 1868 East Hazelton Avenue <br /> L. ZPROGRAM COORDINATORS <br /> a, - •;T :� Stockton, California 95205-6232 Robert McClellon,REHS <br /> m: Jeff Carruesco,REHS,RDI <br /> r. Kasey Foley,REHS <br /> • C.. � ::.;p Website: www.sjgov.org/ehd Linda Turkatte,REHS <br /> v�iFdR`' Phone: (209)468-3420 Rodney Estrada,REHS <br /> Adrienne Ellsaesser,REHS <br /> FaX: (209)464-0138 <br /> November 20, 2013 <br /> Kim White 9171 9690 0935 0039 1696 76 <br /> Elite IV Contractor's, Inc. <br /> Wigwam <br /> Stockton, <br /> FILE COP Y <br /> Stockton, CA 95252 05 v <br /> SR0068457 <br /> Re: Charter Way Chevron <br /> 508 W. Dr. Martin Luther King, Jr. Blvd., Stockton <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to convert the diesel tank to 87 octane (including reprogramming the <br /> monitoring panel and replacing the probe float), replace the failed diesel spill container, and <br /> replace the plumbing, above the shear valve, under the current diesel dispensers on the <br /> underground storage tank(UST) system at the above noted address. The permit has been <br /> approved with the following conditions: <br /> Contact the local fire <br /> any applicable tsar the <br /> Joaq .in Valley Air Pollution Control <br /> 1 District for <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Stacy Rivera at (209) 468-3440 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. Corrosion protection: Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling. <br /> b. Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic <br /> test (or equivalent). Proper drainage must also be verified. <br /> c. Visual inspection of the piping under dispensers 1/2 and 7/8. <br /> d. Secondary containment testing on converted tank (diesel/87) - <br /> Please be aware that the facility cannot operate the UST system or receive fuel in <br /> the converted tank(diesel/87) prior to the EHD inspection and approval. <br /> 4; Since concrete will be broken near the converted (diesel/87) UST; a secondary <br /> containment test must be performed on the converted tank once concrete is poured, in <br /> accordance with the manufacturer's guidelines. <br />