My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:39:10 PM
Creation date
11/4/2018 3:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
3/29/2018 3:42:52 PM
QuestysRecordID
3839705
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Mr. Don Mukai - 2 - <br /> CONV-82000 product literature; State Registered Professional Engineer Approval letter; <br /> Conversion Frame Specifications; and Bravo Conversion Frame Installation Instructions. <br /> State Water Board staff also visited the Bravo production facility where the CONV- <br /> B2000 is manufactured. A California registered Professional Engineer has reviewed the <br /> Bravo catalog sheet with specifications and the 82000 Conversion Frame Installation <br /> Instructions and has concluded that the frame is acceptable for adapting an existing <br /> installed UDC to a new dispenser(See Enclosure). <br /> Conditions of Approval <br /> Based on the Professional Engineer's review and the documentation you've submitted, <br /> we are granting approval of the CONV-B2000 under the following conditions: <br /> 1. This model comes in several sizes in order to accommodate various dimensions <br /> of UDC and dispenser. Schematics of all existing and future sizes for the CONV- <br /> B2000 shall be made available upon request of the State Water Resources <br /> Control Board (State Water Board). <br /> 2. Materials and procedures employed in the construction of the CONV-82000 shall <br /> remain the same as the materials that were indicated in the documents reviewed <br /> by the State Water Board. <br /> 3. Installation procedures in no way supersede local, State, and federal regulations. <br /> Installers must obey all local laws, regulations, and requirements when installing <br /> the CONV-B2000. <br /> 4. The procedures (Bravo Conversion Frame Installation Instructions, dated <br /> 3/25/08) submitted in the approval process must be followed in their entirety. <br /> Any variations in the installation procedures must be reviewed and approved by <br /> the State Water Board. <br /> 5. Only installers meeting the requirements of CCR, Title 23, section 2715(h), <br /> including training and certification by the manufacturer(S. Bravo Systems, Inc.), <br /> are allowed to install this product. <br /> 6. Final authority to approve the use of the CONV-B2000 in a particular jurisdiction <br /> rests with the local regulatory agency. The local agency may require pre- <br /> approval, permit, and/or inspection of the installation by either local agency staff <br /> or a registered professional engineer(special inspector)who has education and <br /> experience with underground storage tank system installations. <br /> 7. Per CCR, § 2636(f)(1) the UDC must be equipped with a continuous monitoring <br /> system that either activates an audible and visual alarm or stops the flow of <br /> California Environmental Protection Agency <br /> %%Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.