Laserfiche WebLink
t <br /> 40 Page 1 of 1 <br /> Stacy Rivera [EH] <br /> From: Mark Vendeiro [m.vendeiro@att.net] <br /> Sent: Thursday, January 13, 2011 4:24 PM <br /> To: Stacy Rivera [EH] <br /> Subject: SRH Food and Gas <br /> Stacy, <br /> We have been kicking around ideas for the monitoring system while we do our conduit, wiring, and <br /> console relocation work. <br /> Currently we mentioned running the sensor wiring above ground while we do the conduit work. <br /> Another option to consider is putting the annular spaces under vacuum. We could have a checklist on <br /> site with the vacuum level checked at regular intervals. They even have one of their brothers on site all <br /> night so a midnight reading could be done. <br /> This would allow us to complete our work while maintaining some kind of monitoring for the very short <br /> term. I am thinking we would need to have this method of monitoring for three days maximum. <br /> Please let me know what you think. <br /> Thank you, <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br /> mvpeng@att.net <br /> 916-205-1537 <br /> 1/24/2011 <br />