Laserfiche WebLink
Monitoring system • <br /> • We plan to relocate the Veeder Root TLS 350 from its current location to the southern wall <br /> (approximately eight feet) <br /> • We will schedule an inspection with you to verify the proper monitoring system operation <br /> • After the ISD components have been installed we will cold start the TLS and schedule an inspection <br /> with you immediately to again verify proper monitoring system operation <br /> Miscellaneous <br /> • Finish the connection of the gasoline vent risers to the existing Healy CAS tank <br /> • After dispenser start up we will purge the product lines of air at the impact valves <br /> • Calibrate the dispensers <br /> • Provide for third party post upgrade complete system vapor recovery testing as prescribed by the San <br /> Joaquin Valley Air Pollution Control District <br /> • Provide for tank annular space testing (if needed) <br /> • We will remove about 10 feet of concrete at the new store building entrance to relocate the fueling <br /> system conduits <br /> There is the possibility that we might need to remove concrete at several areas over the tanks to re-work the <br /> monitoring system conduits to allow for new conductors to be installed. These areas are at the middle of the <br /> tanks and at the annular riser ends of the tanks and at least 10 feet from the piping sumps and piping runs. If <br /> this is done will have the annulars tested by Afforda Test. <br /> The necessary contractor certifications and maps are attached. <br /> Thank you, <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br />