Laserfiche WebLink
G. Construction personnel to work in safe and organized manner. <br /> * Give a description of procedures, such as the <br /> incorporation of the "buddy system" discussed in the <br /> OSHA regulations . <br /> H. In the event that chemicals or hazardous materials other than <br /> already known to PHS/EHD, Crisp Construction Co_, INC - will <br /> notify PHS/EHD. <br /> I . The following safety equipment and clothing shall be worn at <br /> the job site as per OSHA regulation 29 CFR 1910 . 120 . <br /> LEVEL D: Safety goggles Steel toe shoes <br /> Hard Hats Protective Overalls <br /> J. Fire extinguishers will be present onsite: will be on shop truck . <br /> Location: indicate location and show on <br /> site map. <br /> K. EMERGENCY ROUTES: <br /> See Hospital Route Map enclosed <br /> L. CONTINGENCY PLAN: <br /> If an injury occurs, take the following action: <br /> * Get medical attention for the injured person <br /> immediately. <br /> * Notify the Site Safety Officer and Site Team <br /> Leader. <br /> * Depending on the type and severity of the injury, <br /> notify Consulting Physician or the occupational <br /> physician for the injured person. <br /> * Notify the injured person' s personnel office . <br /> * Prepare the incident report. The Site Safety <br /> Officer is responsible for its preparation and <br /> submittal to the Health and Safety Direction <br /> and corporate personnel office within 24 hours . <br /> * The Site Safety Officer will assume charge during <br /> a medical emergency. <br /> * EMERGENCY ROUTES - see Hospital Route Map. <br />