My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1991 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 1991 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 3:26:05 PM
Creation date
11/4/2018 3:36:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 2004
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 1991 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1991 - 2004
QuestysRecordDate
4/25/2018 10:10:21 PM
QuestysRecordID
3869105
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRI'ITEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST Iocation at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209} 458_3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name <br /> Facility Address r G � <br /> A Describe the f�r eque of performing the monitorin <br /> Tank r��`57�, � ��. .�� g <br /> � <br /> Pipi g c �rll u o c..6"� <br /> B. What methods and equipment, identified by name and model, wilt be used for <br /> performin the monitoring: <br /> Tank ". <br /> Piping t3ov r r f r <br /> _ <br /> C. escn e the location(s) where the monitoring will be performed (facility lot lan <br /> should be attached): P P <br /> D. List the name(s) and title(s) of the people responsible for performing the mon tofing � f� <br /> and/or maintaining the equipment: g <br /> 1174L1-C <br /> rit/ v - /;nom Evc <br /> i.L <br /> E. Reportin format for mon'toring: <br /> Tank <br /> Piping Cl, t c t F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: <br /> G. Describe the training necessary for the op/eration of UST system, includin i in <br /> and the monitoring equipment:; .- g pip <br /> g, <br /> 57 <br /> y!`{J+�� G <br /> f1....w �� .i 1�"� �.e"!n►�y ,,�.;� 1 y{7 :�+J <br /> f c) i f r =/JC/ L ! . <br /> i' f <br />
The URL can be used to link to this page
Your browser does not support the video tag.