My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1991 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 1991 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 3:26:05 PM
Creation date
11/4/2018 3:36:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 2004
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 1991 - 2004.PDF
QuestysFileName
COMPLIANCE INFO 1991 - 2004
QuestysRecordDate
4/25/2018 10:10:21 PM
QuestysRecordID
3869105
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Prior to tank lining, a site assessment must be performed under the direction of Public Health Services <br /> Environmental Health Division (PNS-EHD), site mitigation unit. <br /> J Site Assessment has been performed under PHS-EHD direction <br /> Site Assessment has not been performed under PHS-EHO direction. Please contact PHS-EHO <br /> site mitigation unit at (209) 468-3450 for information regarding the assessment requirements. <br /> 2. Reason tanks will be interior lined/repaired: <br /> Meet State/Federal upgrade requirements (submit PHS-EHD UST upgrade permit application <br /> with this application) <br /> Tank system failure, please describe: <br /> 3. The following tests are required to be performed prior to lining to determine the structural integrity of the <br /> n } UST: <br /> Steel tanks <br /> Ultrasound Test (Note: The UST shall be closed in accordance with Article 7 Title 23 CCR if the <br /> tank's average metal thickness is less than 75 percent of the original 'mall thickness of if the tank <br /> has any of the listed defects in Article 6, Title 23 CCR section 2663 (b) (2) (B)) <br /> Certification by a "Special Inspector' that the tank is structurally sound for tank lining and <br /> continued use: <br /> a_ sandblast to white metal <br /> �b. count number of holes, splits, perforations, and other defects <br /> ----c. submit result to EHD <br /> Non-steel tanks, fiberglass <br /> Certification by a "Special Inspector" that the tank is suitable for lining. <br /> _a. interior walls cleaned by wipe down <br /> b. interior diameter measurements <br /> _c. visual check for structural, tension, or compression problems <br /> 4. Corrosion protection system <br /> 1 ' <br /> rule Please describe the type of corrosion protection system you propose to install. The cathodic protection <br /> system retrofitted on existing UST systems must be designed by a corrasion specialist certined by the <br /> National Association of Corrosion Engineers (MACE) or by a qualified professional engineer. Metal <br /> components of the UST system (i.e. submersible pumps, piping etc) that rcutineiy contain fuel and are in <br /> contact with the ground mus; also be cathcdically protec,ed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.