My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 2004 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:07 PM
Creation date
11/4/2018 3:40:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2006
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 2004 - 2006.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2006
QuestysRecordDate
4/25/2018 10:46:56 PM
QuestysRecordID
3869444
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />0 0 Page of <br />8. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ❑ industry Standard ❑ Professional Engineer <br />X Other (Specify) County Protocol <br />Test Method Used: X Pressure ❑ Vacuum. ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Marsh P0140 � Equipment Resolution: .01 <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Piping Run #T-1 <br />Fiberglass <br />Smith <br />3" <br />100' <br />Diesel <br />3 x 2 in sump <br />15 Minutes <br />11:00 <br />5.0 <br />12:00 <br />5.0 <br />1 Hour <br />0.00 <br />.001 <br />x Pass ❑ Fail <br />Piping. Run #T-1 <br />Vent <br />Fiberglass <br />Smith <br />3" <br />40' <br />Vent <br />3 x2 in sump <br />15 Minutes <br />11:00 <br />5.0 <br />12:00 <br />5.0 <br />1 hour <br />0.00 <br />.001 <br />x Pass ❑ Fail <br />15 Minutes <br />11:00 <br />5.0 <br />12:00 <br />5.0 <br />1 Hour <br />0.00 <br />.001 <br />x Pass ❑ Faii <br />15 Minutes <br />11:00 <br />5.0 <br />12:00 <br />5.0 <br />1 Hour <br />0.00 <br />.001 <br />x Pass ❑ Fail <br />Comments — (include information on re airs made prior to testin , and recommended follow -u or ailed tests) <br />Piping Run #T-2 <br />Piping Run #T-2 <br />Vent <br />Fiberglass <br />Fiberglass <br />Smith <br />Smith <br />3„ <br />3" <br />70' <br />30' <br />Diesel <br />Vent <br />3x2insump <br />3 x 2 in sump <br />15 Minutes <br />11:00 <br />5.0 <br />12:00 <br />5.0 <br />1 Hour <br />0.00 <br />.001 <br />x Pass ❑ Faii <br />15 Minutes <br />11:00 <br />5.0 <br />12:00 <br />5.0 <br />1 Hour <br />0.00 <br />.001 <br />x Pass ❑ Fail <br />Comments — (include information on re airs made prior to testin , and recommended follow -u or ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.