Laserfiche WebLink
SWRCB. January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 7 of 7 <br />Facility is Not Equi22cd With S ill/Overftll Containment Boxes <br />S ill/Uverfill Containment Boxes Are Present but were Not Tested <br />Test Method Developed BY: [ ] Spill Bucket Manufactumrr [X ] Industry Standard [ I Professional Engineer <br />Other eci <br />Fest Method Used. [ ] Pressure 1 ] vacuum IX ] Hydrostatic <br />Other(Spec <br />Test Equipment Used: Equipment Resolution. <br />w1 .'�,.7.fi. .k��i t'.'+Ii:7+H''1•,P,:- w,_9ft�'�'tlEk7°,:�:5%F:k '?ii�f��ff�l�itl1`7u�{1�3h�4ii'� .�"�iliz'?4:�� `tl`4�i✓����.l�wh7.,. . .. <br />., " , `: <br />S ill Box # <br />S i1 B x # <br />Spill Box # <br />Spill Box # <br />— <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between <br />applying <br />pressure/vacuuWwater and <br />starting test: <br />'fest Start Time: <br />InitialReading 1 <br />Test End Time: <br />Final Reading <br />Test Duration: <br />Change in Readin Rf-R7 <br />Pass/Fail Threshold of <br />Criteria: <br />Test Result: <br />]Fail <br />Comments — (include information on repairs trade prior to testing, and recommended follow-up for. failed tests) <br />