My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:11 PM
Creation date
11/4/2018 3:46:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
4/25/2018 11:45:33 PM
QuestysRecordID
3869854
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ah <br />AM <br />INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />PP Tanlmolbr,, y <br />TEST DATE:02/21/07 <br />8501 N MOPAC EXPRESSWAY, SUITE 400 WORD ORDER NUMBER2247471 <br />CLIENT:RYDER FUEL COMPLIANCE <br />AUSTIN, TEXAS 78759 (512) 451-6334 SITE:RYDER 1071A <br />TANK INFORMATION <br />Tank ID: 12K 1 <br />Tank manifolded: No Bottom to top fill in inches: <br />168.8 <br />Product: DIESEL <br />Vent manifolded: YES Bottom to grade in inches: <br />Capacity in gallons: 12 ,110 <br />Vapor recovery manifolded: NO Fill pipe length in inches: <br />72.8 <br />Diameter in inches: 96.00 <br />Overfill protection: YES Fill pipe diameter in inches: <br />4.0 <br />Length in inches: 391 <br />Overspill protection: YES Stage I vapor recovery: <br />NONE <br />Material: DW STEEL <br />Installed: ATG Stage II vapor recovery: <br />NONE <br />CP installed on: <br />COMMENTS <br />Note that line "A" refers to <br />the Main supply line dispenser# 3-4, line "B" refers to satelite dispenser#3, line <br />"c" refers to satelite dispenser# 4. <br />TANK TEST RESULTS Test: Method: VacuTect <br />LEAK DETECTOR TEST RESULTS Test method: FTA <br />Start (in) <br />End (in) <br />Dipped Water Level: <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 <br />L.D. #2 <br />Dipped Product Level: <br />Probe Water Level: <br />Make: vAPORLESS <br />Ingress Detected: Water Bubble Uliage <br />Model: LD2000 <br />Test time: <br />SIN' UMEADABLB <br />Open time in sec: 8.00 <br />Inclinometer reading: <br />Holding psi: 2s <br />psi: <br />VacuTect Test Type: <br />NOT <br />Resiliency 130 NOT <br />VacuTect Probe Entry Point: TESTED <br />Test leak rate mllm: 189.0 TESTED <br />Pressure Set Point: <br />Metering psi: 18 <br />Tank water level in inches: <br />Calib. leak in gph: 3.00 <br />Water table depth in inches: <br />Results: PASS <br />Determined by (method): <br />Result: <br />COMMENTS <br />COMMENTS <br />LINE TEST RESULTS Test type. TLD -1 <br />LINE <br />A B C D <br />�- <br />Material <br />DW FIBERG DW FIBERG DW FIBERG FIBERGLASS <br />Diameter (in): <br />2.0 2.0 2.0 <br />Length (ft): <br />100.0 25.0 25.0 <br />Test psi: <br />50 50 50 <br />Bleedback cc: <br />50 50 50 <br />Test time (min): <br />30 30 30 NOT <br />Start time: <br />14:10 14:10 14:10 TESTED <br />End time: <br />14:40 14:40 14:40 <br />Final gph: <br />0.000 0.000 0.000 <br />Result: <br />PASS PASS PASS <br />Pump type: <br />PRESSURE PRESSURE PRESSURE NONE <br />Pump make: <br />RED JACKET NONE NONE NONE <br />COMMENTS <br />Impact Valves Operational: YES <br />Main & satellite lines tested <br />together. <br />Printed 03106/2007 16:52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.