Laserfiche WebLink
Fram- 01/4009 17:07 #348 P.0081011 <br />BAL,CU <br />rwt'eer <br />8. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />L <br />Test Method Developed By: '.: Spill Bucket Manufacturer <br />Other FSpecifi) <br />X Industry Standard L Professional Engineer <br />Test Method Used: ': Pressure <br />Other (Specify) <br />'I Vacuum X Hydrostatic E <br />Test Equipment Used: Ronan/Caldwell hydrostatic Sump Tester <br />Equipment Resolution: O.OU00" <br />Box # <br />Bucket Diameter: <br />Box # <br />Box #i Box <br />— <br />Bucket Depth: - <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />_ <br />Test Start Time: <br />Initial Reading (Ry): <br />_ <br />fest End Time: <br />Final Reading (RF): <br />Test Duration: <br />_ <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or PASS =No Loss or loss of 0.0020" or less in 12 minutes <br />Criteria: <br />Test Result: .. <br />- <br />Comments — (include infomiation on repairs made prior to testing, and r~ecommen(leti.follow-atp forfailed tests) <br />C:lthuuments and Settings"N11%Local Settinpffenitxiva y Enteniei Files••dt.K) \Ryder pmt2.doe <br />