Laserfiche WebLink
D PROGRAM CONSOLIDATED F <br /> UIVDERGRO TANKS 6,1 (" 4 0? (p <br /> IJND STORAGE TANKS - Uk <br /> 2�� <br /> TANK PAGE 2 <br /> UNDERGRO VL PIPING CONSTRUCTION(Check,u chat a 1y) <br /> SYSTEM TYPE UND PIPING Pae of <br /> CONSTRUCTION/ ❑I PREASURE <br /> ❑2.SUCTION ABOVEGRO <br /> MANUFACTURER �I.SINGLE WALL ®7.GRAVITY 458. �1.PRESSURE UND PIPING <br /> ❑3.LINED TRENCH 13 g9 PT R ❑2.SUCTION <br /> DOUBLE WALL ❑95.UNKNOWN 46n ❑ I.SINGLE WALL 3'GRAVITY <br /> 459. <br /> MANUFACTURER ❑2.DO Ll 9s.UNKNOWN <br /> I.BARE STEEL I El 99 <br /> DOUBLE WALL 452. <br /> 6.FRP COMPATIBLE W/100%M��OL 461' MANUFACTURER .OTHER <br /> E32.STAINLESS STEEL 0 7,GALVANIZED STEEL El L BARE :I <br /> Cl 3.PLASTIC COMPATIBLE WITH CONTENTS ❑6.FRF COMPATIBLE W/100.METHANOLS <br /> ❑2.STAINLESS STEEL <br /> ®4.FIBERGLASS ❑g,FLEXIBLE(HDPE) ❑95 UNKNOWN EJ 3.PLASTIC COMPATIBLE W/CONTENTS ❑7 GALVANIZED STEEL <br /> ❑5.STEEL W/COATING ❑9.CATHODIC(HOPE) <br /> PROTECTION 99.OTHER ❑4,FIBERGLASS 118.FLEXIBLE(HDPE) <br /> ❑9.CATHODIC PROTECTION ❑99.OTHER <br /> VII.PIPING LEA °bp' �5.STEEL W/COATING <br /> UNDERGROUND PI DINGE�ION(Check all that apply)(A drscn tion oftke monilodn fJ 95.UNKNOWN <br /> SINGLE WALL P/PING SPmgnm shell be s,8mined to the l,cal,gency.) acs. <br /> PRESSURIZED PIPING nee. SINGLE WAL[,PIPING ABOVEGROUND PIPING <br /> (Check all that apply): <br /> ❑I. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH g1I7p pip <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE, PRESSURIZED PIPING(Check all that a I 467' <br /> +AUDIBLE AND VISUAL ALARM$. AND SYSTEM DISCONNECTION )' ELECTRONIC LME LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT OFF FOR LEAK,SYSTEM FAILURE,PND SYSTEM H AUTO PUMP <br /> 2. MONTHLY 0.2 GPH TEST +AUDIBLE AND VISUAL ALARM$ <br /> 03. ANNUAL INTEGRITY TESTGPH) 2. MONTHLY o.2 CPH TEST <br /> ECTION <br /> ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> CONVENTIONAL SUCTION SYSTEMS ❑4. DAILY VISUAL CHECK <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIE CONVENTIONAL SUCTION SYSTEMS(Check all that a I <br /> INTEGRITY TEST(0.1 GPH) NNIAL PIPING <br /> SAPS SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): pp y) <br /> [15. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> [17. SELF MONITORING ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> GRAVITY FLOW SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> 139. BIENNIAL INTEGRITY TEST(0.1 GPH) ❑Z SELF MONITORING <br /> GRAVITY FLOW(Check all that apply): <br /> 118 DAILY VISUAL MONITORING <br /> SECONDARILY CONTAINED PIPING [39. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> PRESSURIZED PIPING(Check all that apply):I SECONDARILY CONTAINED PIPING 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE PRESSURIZED PIPING(Check all that apply): <br /> ALARMS AND(Check one) SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> [I a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ALARMS AND(Check one) <br /> ❑b. AUTO PUMP SHUT OFF FOR ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> DISCONNECTION <br /> LEAKS SYSTEM FAILURE AND SYSTEM (]b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> Dc. NO AUTO PUMP SHUT OFF DISCONNECTION <br /> 0 11. AUTOMATIC LDIE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT (]c. NO AUTO PUMP SHUT OFF <br /> OFF OR RR37RX-DON ❑11. AUTOMATIC LEAK DETECTOR <br /> 012. nxrcuac f reJRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM [112. ANNUAL INTEGRITY TEST(0.I GPH) <br /> I3. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS SUCTION/GRAVITY SYSTEM <br /> /EMERGENCY GENERATORS ONLY(Check all that apply) ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO <br /> EMERGENCY GENERATORS ONLY(Check all that apply) <br /> AUDIBLE AND VISUAL ALARM��AUTO PUMP SHUT OFF ❑14. CONTINUOUS SUMP SENSOR WITFIOLIT AUTO PUMP SHUT OFF <br /> ❑I5. AUTOMATIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUDIBLE AND VISUAL ALARMS <br /> SHUT OFF OR RESTRICTION ( ) --AU2 FLOW <br /> ❑ 15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> ❑16. ANNUAL INTEGRITY TEST(O.I GPH) <br /> ❑17. DAILY VISUAL CHECK ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. ❑1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE <br /> DATE INSTALLED 02. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS f]4 DAILY VISUAL CHECK 469. <br /> (]5. <br /> [13. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR TRENCH/LINER MONITORING <br /> DISPENSER A III IBLE AND VISUAL ALAILMS <br /> 6. NONE <br /> certify that the inform-ad IXOWERIO E ORSGNATURE <br /> ro eBinisTru a accu mkno SIGNATURE <br /> SIGN 0 RA 0 <br /> DATE:April 4,2007 470. <br /> E OF OWNEII TOR(print): AMY V1%te TITLE OF OWNER/OPERATOR: COIDpllanCe Manager 472' <br /> Permit Number(Agency use only) 473. Permit Approved By(Agency use only) 474. Pernfit Expiration Date(Agency use only) 475. <br /> UPCF hwfwre-b(1199)-3/4 www.unldocs.org Rev.02/16/00 <br />