My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
2300 - Underground Storage Tank Program
>
PR0506371
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:33 PM
Creation date
11/4/2018 3:59:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0506371
PE
2381
FACILITY_ID
FA0007375
FACILITY_NAME
MULTI-DAY ENTERPRISES INC
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
13902008
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\1448\PR0506371\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. A. Describe the method that will be utilized to purge and/or inert the tank(s): <br />Tank(s) and lines) will first be triple-rinsed and pumped out. Next, the j <br />appropriate aurounl of dry Ice (15 lbs. per 1,000 gal. cap. diesel and 30 lbs. <br />gasoline) will be added in the lank(s) still then monitored with an LEL meter. <br />h. TRAM pe llauler. Jhu Thorp Oil Colit, Inc <br />Address: 351 N. Beckman Road / P.O. Box 35 City: Lodi, CA Zip: 95341-0357 <br />Phone No. (916) 462-4581 <br />llauler Registration M (If hauled as hazardous): 2667 <br />C. Tank/Piping Disposal Site: <br />Name: schniizer Steel Prodncis <br />Addncss: _ 121NNt hohom Hou leyard__ c'hy: _Rlie lit, (.1 to zip: _N5741_ i <br />Phone No. (916) 985-4810 <br />PPA IDM: (if (ranslnorled to a perndued ISO facility): <br />it <br />9. Describe, in detail, how the soil anal/or water sangrle(s) beneath (lie tank and piping will be obtained: <br />After tank removal we will excavate 2 to 3 feel under the former tank location into <br />native soil at the appropriate locations with the backhoe at the direction of the EIID ` <br />representative mt site. Samples will be taken from the backhoe bucket. <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />Ilackfill of the excavation will be completed at the appropriate thne during this project. <br />ii <br />A determination of the most cost-effective nretirod will be made and mndetiaken. Pill i! <br />material will be what is the most cost-effective for the final desired condition. <br />11. Handling of excavated soil: <br />a) What nnalerial will he used to line the tank pil and cover the stockpiie7 <br />6 mil (hick plastic sheeting <br />b) What will be the final destination of the excavated shx:kpile7 <br />A detennination will be made at tine appropriate time. <br />c) Contaminated Soil flazardous Waste flouter: <br />Names: Dillard Trucking Ilauler Registration M: 1745 <br />Address: 3291 Byers Road / Rt. I Bx 73 City: Byron, CA Zip: 94514 <br />Phone No. (415) 634-6850 <br />Pape s :I <br />r <br />'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.