Laserfiche WebLink
ANNUAL STATISTICAL INVENTORY RECONCILIATION (SIR) REPORT <br />Annual summary reports are required for retail and non -retail facilities <br />FACILITY NAME <br />FACILITY ADDRESS <br />CITY, STATE 7JP <br />Unocal No. 4409 <br />1502 N. EI Dorado <br />Stockton, CA_ 95204 <br />TANK OWNER/OPERATOR <br />LAST TANK TEST DATE <br />LAST PIPING TEST DATE <br />PASS/FAIL <br />PASS/FAIL <br />PRODUCT Regular Unleaded <br />TANK I.D. Number Tank No. 87-1 <br />Inocal TANK CAPACITY 12,000 <br />LAST LEAK DETECTOR CHECK DATE PASS/FAIL <br />LAST METER CALIBRATION CHECK DATE PASS/FAIL <br />All monthly SIR results for the above mentioned tank at the above mentioned facility were 'pass" for the twelve <br />month period from January, 1995 to December, 1995. <br />❑ Monthly SIR results showing "fail" or "inconclusive" occurred on the following months, in the listed amounts, for the <br />UST. If the SIR result for a month exceeded the SIR method's thres �i vr� appropriate corrective <br />actions described in Section 2646.1 must be taken. The local agencC rt_o}4y"�'m of receiving a <br />"failed" or "inconclusive" SIR report. v ��t111c��� VVV <br />Q......ms... s .o,,i ro��df� from monthly SIR reports. CompfFeU,91 0 nonths. <br />No Analysis Performed <br />Negative Calculated Leak Rate indicates a Gain <br />Submit report within 15 days following the end of the last month of the twelve-month period covered by this summary report. <br />Send to: (local implementing agency) <br />I certify under penalty of perjury that all SIR results listed above are as calculated. <br />Signature of Tank Owner/Operatoror Agent <br />SW RCB - Annu.ISIR.NV-02 <br />Leak <br />Threshold <br />(gph) <br />Minimum <br />Detectable <br />Leak Rate <br />(gph) <br />11�SER <br />Leak Rate <br />(gph) <br />ICES <br />Pass, Fall <br />Inconclusive <br />0.10 <br />0.10 <br />0.01 <br />Pass <br />VMay1995 <br />0.10 <br />0.20 <br />-0.02 <br />Pass " <br />0.10 <br />0.20 <br />0.02 <br />Pass <br />0.10 <br />0.20 <br />-0.11 <br />Pass " <br />0.10 <br />0.20 <br />-0.50 <br />Pass " <br />6 <br />June 1995 <br />0.10 <br />0.25 <br />-0.07 <br />Pass " <br />7July <br />1995 <br />0.10 <br />0.36 <br />-0.06 <br />Pass" <br />8 <br />Aug 1995 <br />0.10 <br />0.37 <br />-0.12 <br />Pass " <br />9 <br />Sept 1995 <br />0.10 <br />0.32 <br />-0.04 <br />Pass " <br />10 <br />Oct 1995 <br />0.10 <br />0.20 <br />-0.01 <br />Pass " <br />11 <br />Nov 1995 <br />0.10 <br />0.20 <br />0.01 <br />Pass <br />12 <br />Dec 1995 <br />0.10 <br />0.20 <br />-0.04 <br />Pass " <br />No Analysis Performed <br />Negative Calculated Leak Rate indicates a Gain <br />Submit report within 15 days following the end of the last month of the twelve-month period covered by this summary report. <br />Send to: (local implementing agency) <br />I certify under penalty of perjury that all SIR results listed above are as calculated. <br />Signature of Tank Owner/Operatoror Agent <br />SW RCB - Annu.ISIR.NV-02 <br />