My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1700
>
2300 - Underground Storage Tank Program
>
PR0501479
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 10:09:26 PM
Creation date
11/4/2018 4:01:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0501479
PE
2381
FACILITY_ID
FA0005117
FACILITY_NAME
EL DORADO SENIOR APARTMENTS
STREET_NUMBER
1700
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703326
CURRENT_STATUS
02
SITE_LOCATION
1700 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\1700\PR0501479\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/28/2012 8:00:00 AM
QuestysRecordID
75827
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��eoaa e <br /> c <br /> STATE OF CALIFORNIA �` <br /> s` <br /> STATE WATER RESOURCES CONTROL BOARD � �,a o <br /> �� o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B ?p � „ o <br /> �ITpNM�e <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ ] PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 8 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: �,y� ; <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN !700 S, 97 Oaw'"- 5y y r'-_k-lv'j <br /> A. OWNER'S TANK 1.D. B. MANUFACTURED BY: � <br /> C. DATE INSTALLED(MODAYIYEAR) 6 D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-11SMARKED,COMPLETE ITEM C. REGULAR <br /> A [-11 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1aUNLFADED 8 3 DIESEL ❑ 8 AVIATION GAS <br /> 2 PETROLEUM ❑ 80 EMPTY ❑ 1 PRODl1CT ❑ 1b PREMIUM 4 GASOHOL ❑ ] METHANOL <br /> ❑ UNLEADED ❑ 5 JET FUEL <br /> ❑ 3 CHEMICAL PRODUCT E UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN REM D. BELOW) <br /> 0. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.%: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES AB.AND C,AND ALL THAT APPLIES IN BOXD <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 5 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ i BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDEUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYO LINING n 3 FOXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 6 GLASS LINING ❑ 6 UNLINED ���(/95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U I SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 KN A U 99 OTHER <br /> C. MATERIAL AND A U 1 SAFE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATI A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 8 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 O A U 99 OTHER <br /> D. LEAK DETECTION ❑ I AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 MOhR IIIIA <br /> GL [:]99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VAPOR MONITORING n 1 Al1TOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ ] INTERSTITIAL MONITORING E—] 91NONE 55 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAV/Yfi) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> AAPPLICANPS NAME / DATE// <br /> PRINTED i SIGNATU <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# F TANK# <br /> STATE LD.# [3111 <br /> — <br /> PERMITNUMBER PER MIT APPROVED BY/DATE / 27 <br /> FORM a (9.90) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> /nom FOR9DNB114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.