My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2749
>
2300 - Underground Storage Tank Program
>
PR0232564
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 5:10:51 PM
Creation date
11/4/2018 4:07:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0232564
PE
2381
FACILITY_ID
FA0003908
FACILITY_NAME
DURANGO TIRE CO
STREET_NUMBER
2749
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17502403
CURRENT_STATUS
02
SITE_LOCATION
2749 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2749\PR0232564\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..,i <br /> SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert(tank's bottom) at a collection depth not to exceed 2 -4 feet. if <br /> contamination is documented during closure, an Unauthorized Reiease Notification must be completed and submitted within five <br /> (5) working days pursuant to California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> // (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000 - 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> BTANK & PIPING PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> 11- STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> q (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order <br /> to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR Moreper Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 046 (Revised 7/10/96) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.