Laserfiche WebLink
8. a. Describe the method'� 7 <br /> � VSC that will be utilized to purge a d/or inert the tank(s): <br /> i 4 61 I 1 s JL (,j SJ <br /> S17�1-0011 <br /> b. TankfPiping Hauler- <br /> Nam <br /> auler:Name <br /> 4'i <br /> Addreg-q City p <br /> Phone No.( 1 <br /> Hauler Registration# (if hauled as hazardous) <br /> c. Tank/Piping Disposal Site: <br /> Name CT t')�-)Pfu <br /> - <br /> Address Cit}' Zip <br /> Phone No.(, <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 9. It the sampling firm an independent third party from the contractor? YES HI-� NQ() <br /> 9a. Describe,in detail,how the soil andlor water za-ple(s)beneatha tank and pi g will be obtained: <br /> C3A Ce 3 7 �• i <br /> i lr f3M SS v3� S <br /> 10. Describe liow the excavation will be backfilled with suitable material upon removaL- <br /> Vz- <br /> o r <br /> 11. Handling of excavated sol: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> sC) Nk�' L�' (-jI < � <br /> b)What will be the final destination of the excavated stockpile? <br /> c) Contaminated Soil Hazardous Waste Hauler: / <br /> Name_ f—,O �eS 5; - y� Hauler Registration# <br /> Address �y riJ`J �1'�'� Y • qty Zip <br /> Phone No. ( S' ti 1390 <br /> EH 23 0d6(Revised 3115102) Page 5 <br />