Laserfiche WebLink
8. A. Describe the method that will be utilized to purge and/or Inert the tsnk(s): <br /> Dry ice will be added to the tanks at the rate of 201111 per 1x000 gallon <br /> capacity for Memel and IN Der 1,000 gallon rapanityfpr gasol na.nraL3thi9ur <br /> products. <br /> b. Tank/Plping Hauler: <br /> Name Jim Thorpe Oil, Inc. <br /> Address P.O. Box 357 cuy Lodi, CA Zip 95241-0357 <br /> Phone No.( 209 ) 368-6175 <br /> Hauler Registration 0 (If hauled as hazardous) 2667 <br /> C. Tank/Plping Disposal Site: <br /> Name Schnitzer Steel. Products <br /> Address 12000 Folsom Blvd. City Rancho Cordova ZIp95742 <br /> Phone No.( 916 l 985-4810 <br /> RPA tDM (if transported to a permitted TSD facility) <br /> 9. Describe, In detail, how the soil and/or water sample(s) beneath the tank and piping will be obtalnedl <br /> Soil samples will be taken from native soil two to three feet under the former <br /> tank locationwith a backhoe Samples will be taken from the bucket Water aamples . <br /> if needed, will be taken with a bailer. <br /> in. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Bnrkfill of the excnvntion(s) will be done at the nppropriste time during this <br /> project. Backfill material will consist of the excavated spoil if useable, and <br /> other clean compnctable material.. <br /> It. handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> 6tymtil Pintstic sheeting. <br /> b) Ciass112eforWardesInMo oft aeC€a��tad 9"pilel Class 1 Chem. Waste , Kettleman City <br /> Depending upon the contnminnte, levels of contamination and quantities of Boil, <br /> the spoil will be. hnuled to either a cines 1 or class 2 landfill or treated on site. I <br /> C) Contaminated Soil Hazardous Waste Hauler: <br /> I <br /> Name Jim Thorpe 011 , inc. 2667 <br /> Basler Regbtratlos 0 <br /> Address P.O. Box 357 city Lodi, CA Zi95241-0357 <br /> P <br /> Phone No. 209 ) 368-6L75 <br /> Contractor will notify USA Dig at least 48 hrs. prior to excavation <br /> PH 23 846 (Revised 9/11/96) Page S r <br /> � �% <br />