Laserfiche WebLink
.04/19/2002 09:10 2093651543 TANKNOLOGY • PAGE 03 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> .fp TamrMlogy <br /> TEST DATE:03/20102 8900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER2221561 <br /> CLIENT ULTRAMAR INC AUSTIN,TEXAS 78757(.512)451.6834 SITE ULTRAMAR 698 <br /> ;qwmTy.Fg4M?'5 <br /> Tank ID: 0.3 1 Tank mandolded! No Bottom to top fill in inches! 133.5 <br /> Product: suPREME Vent manifolded; YES Bottom to grade in inches: 141.0 <br /> Capacity in gallons: 20,152 Vapor recovery manifolded: YES Fill pipe length in inches: 37.5 <br /> Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches; 4.0 <br /> Length in inches: 320 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material, Der STEEL Installed: ATO Stage II vapor recovery: ASSIST <br /> CP installed on: I <br /> COMMENTS <br /> no <br /> Dipped Water Level: Start(in) End(in) Now/passed Falle&replwod NewIp"sed Failed/niplaced <br /> Dipped Product Level: L.D.#1 L.D.01 L.D.#2 L.D.82 <br /> Probe Water Level: Make: <br /> Ingress Detected: Water Bubble Ullaga Model: <br /> Test time SM: <br /> Open time in sec: <br /> Inclinometer reading; Holding psi; <br /> VaouTecl Test Type: NOT <br /> VacuTect Probe Entry Point: TESTED Resiliency in ml: NOT NOT <br /> Test leak rate mill TESTED TESTED <br /> Pressure Set Point: Motoring psi; <br /> Tank water level in inches: Calib, leak in gph: <br /> Water table depth in inches: Results; <br /> Determined by(method): <br /> Result: COMMENTS <br /> COMMENTS <br /> FRIMn FIM7 7's 8"MOVAM `00� wegwgm <br /> 11 <br /> P <br /> gg% <br /> Material: Dw FIBERG <br /> Diameter(in): 2.0 <br /> Length (ft): 60.0 <br /> Test psi: 50 <br /> Bleadback cc: 65 <br /> Test time (min): 30 NOT NOT NOT <br /> Start time: 14,30 TESTED TESTED TESTED <br /> End time: Isior) <br /> Final gph: 0.DO3 <br /> Result: PASS <br /> Pump type: 1?RZSSURE <br /> Pump make, RED J.111,CKET <br /> COMMENTS impact Valves Operational: YES <br /> Printed 04119/2002 08:47 <br />