My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 1998-2004.PDF
QuestysFileName
COMPLIANCE INFO 1998-2004
QuestysRecordDate
5/19/2017 4:43:15 PM
QuestysRecordID
3389407
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/19/2002 09:10 2093653 TANKNOLOGY PAGE 07 <br /> Monitoring System Certification <br /> Site Address: 153E 11TH ST Date of Testing/Service ^03/20/2002 <br /> Results of Testing/Servicing <br /> Software Version lnstal.cd, <br /> Coal the follewing checkllet; <br /> ID Yes Nn Is the audible alarm operational? <br /> x❑ vee Nn Is the visual alarm operational? <br /> rl Yec Q Nc Were all sensors visually Inspected,functionally tested,and confirmed operational? <br /> ❑ Yev ❑No Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not <br /> interfere with their proper operation? <br /> Yar MNc Nr a If alarms are relayed to a remote monitoring station,Is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ Yue ❑N'w ❑N;�' monitoring system detects a leek,fails to ogorate.or is electrically dlsconnected7 If yes:which sensors Inflate positive <br /> shut-down?(check all that apply) LJ Sump/Treneh Sensors; [] Dispenser containment Sensors. <br /> Did you confirm positive shut-down due to leaks andaensor fallure/disconnectior? 0 Yas 0 No <br /> El <br /> For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.;no mechanical <br /> tris ❑'u.• ❑N:A overfill prevention valve is installed),Is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If soat what percent of tank capacity does the alarm trigger? x <br /> El tae v„ Was any monitoring equipment replaced?If yes,Identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Ye. ❑It,• Was liquid found Inside any secondary containmem systems designed as dry systems?(check all that apply) ElProduct, <br /> ❑ Water. If yes,describe causes in Section E.below. <br /> © Ve> ❑W Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,If applicable. <br /> © Yee ❑rm Is all monfortng equipment operational per manufacturers'specifications? <br /> ion 6 halo., describe how twl when r.liese deficiences were or will be corrected. <br /> E. Commento: <br /> page a of � <br />
The URL can be used to link to this page
Your browser does not support the video tag.