Laserfiche WebLink
04/19/2002 09:10 2093653 TANKNOLOGY PAGE 07 <br /> Monitoring System Certification <br /> Site Address: 153E 11TH ST Date of Testing/Service ^03/20/2002 <br /> Results of Testing/Servicing <br /> Software Version lnstal.cd, <br /> Coal the follewing checkllet; <br /> ID Yes Nn Is the audible alarm operational? <br /> x❑ vee Nn Is the visual alarm operational? <br /> rl Yec Q Nc Were all sensors visually Inspected,functionally tested,and confirmed operational? <br /> ❑ Yev ❑No Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not <br /> interfere with their proper operation? <br /> Yar MNc Nr a If alarms are relayed to a remote monitoring station,Is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ Yue ❑N'w ❑N;�' monitoring system detects a leek,fails to ogorate.or is electrically dlsconnected7 If yes:which sensors Inflate positive <br /> shut-down?(check all that apply) LJ Sump/Treneh Sensors; [] Dispenser containment Sensors. <br /> Did you confirm positive shut-down due to leaks andaensor fallure/disconnectior? 0 Yas 0 No <br /> El <br /> For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.;no mechanical <br /> tris ❑'u.• ❑N:A overfill prevention valve is installed),Is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If soat what percent of tank capacity does the alarm trigger? x <br /> El tae v„ Was any monitoring equipment replaced?If yes,Identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Ye. ❑It,• Was liquid found Inside any secondary containmem systems designed as dry systems?(check all that apply) ElProduct, <br /> ❑ Water. If yes,describe causes in Section E.below. <br /> © Ve> ❑W Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,If applicable. <br /> © Yee ❑rm Is all monfortng equipment operational per manufacturers'specifications? <br /> ion 6 halo., describe how twl when r.liese deficiences were or will be corrected. <br /> E. Commento: <br /> page a of � <br />