My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 1998-2004.PDF
QuestysFileName
COMPLIANCE INFO 1998-2004
QuestysRecordDate
5/19/2017 4:43:15 PM
QuestysRecordID
3389407
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDLTL TANK INFORMATION AN EST RESULTS <br /> i i Tdnknoll <br /> TEST DATE:03/20/02 8900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER2221561 <br /> CLIENT:ULTRAMAR INC AUSTIN,TEXAS 78757(512)451-6334 SITE:ULTRAMAR 698 <br /> MAL <br /> Tank ID: #3 1 Tank manifolded: No Bottom to top fill In inches 133.5 <br /> Product: SUPREME Vent manifolded: yEs Bottom to grade In inches: 141.0 <br /> Capacity in gallons: 10,152 Vapor recovery manifolded: yEs Fill pipe length in inches: 37.5 <br /> Diameter in inches: 96.00 Overfill protection:yEs Fill pipe diameter in inches: 4.0 <br /> Length in inches: 328 Overspill protection:yEs Stage I vapor recovery: DUAL <br /> Material: Dw STEEL Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> LEAKOfECTpRT r fo <br /> 7A7�Ke$II, ethod'vacu''ect �.� •% <br /> _ tart(m) Mnc kilir <br /> New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Water Level: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Dipped Product Level: <br /> Make: <br /> Probe Water Level: <br /> Model: <br /> Ingress Detected: Water Bubble Ullage S/N: <br /> Testtime: Open time in sec: <br /> Inclinometer reading: Holding psi: <br /> VacuTect Test Type: NOT Resiliency in ml: NOT NOT <br /> VacuTect Probe Entry Point: TESTED Test leak rate rri TESTED TESTED <br /> Pressure Set Point: Metering psi: <br /> Tank water level in inches: Calib. leak in gph: <br /> Water table depth in inches: Results: <br /> Determined by(method): <br /> Result: COMMENTS <br /> COMMENTS <br /> i,•I. „ D <br /> Material: DW FIBERG <br /> Diameter(in): 2.0 <br /> Length(ft): 60.0 <br /> Test psi: 50 <br /> Bleedback cc: 65 <br /> Test time(min): 30 NOT NOT NOT <br /> Start time: 14:30 TESTED TESTED TESTED <br /> End time: 15:00 <br /> Final gph: 0.003 <br /> Result: PASS <br /> Pump type: PRESSURE <br /> Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: yEs <br /> Printed 04/01/200217:42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.