Laserfiche WebLink
0onitoring System Certification • <br /> Site Address: 153 E 11TH ST Date of Testing/Service: 03/20/2002 <br /> F. In-Tank Gauging / SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑Yes ❑No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑Yes ❑No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No• Was accuracy of system product level readings tested? <br /> ❑Yes ❑No' Was accuracy of system water level readings tested? <br /> ❑Yes ❑No' Were all probes reinstalled properly? <br /> ❑yes ❑No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> RED]NFor equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> O' <br /> No ❑N/A (Check all that apply)Simulated leak rate: ❑ 3 g.p.h❑0.1 g.p.h 0.2 g.p.h <br /> ED]No• Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> No' Was the testing apparatus properly calibrated? <br /> No' ❑NIA For mechanical LLDs,does the LLD restrict product now if it detects a leak? <br /> No• ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ONO'• ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> No' N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ONO*• ❑NIA For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> ' In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Tested the tank overfill visual and klaxon for all 3 tanks. Passed ok. <br /> page 3 of 3 <br />