My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
153
>
2300 - Underground Storage Tank Program
>
PR0231389
>
COMPLIANCE INFO 1998-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
11/4/2018 4:31:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2004
RECORD_ID
PR0231389
PE
2361
FACILITY_ID
FA0003709
FACILITY_NAME
VALERO #3698
STREET_NUMBER
153
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23336607
CURRENT_STATUS
01
SITE_LOCATION
153 E ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\153\PR0231389\COMPLIANCE INFO 1998-2004.PDF
QuestysFileName
COMPLIANCE INFO 1998-2004
QuestysRecordDate
5/19/2017 4:43:15 PM
QuestysRecordID
3389407
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />Executive Order VR -101-D, Phil-Tite Phase I Vapor Recovery System, Exhibit 2, Page 10 <br />Figure 2E <br />Typical Phil -Tito Model M-6050 Vapor Recovery Riser Offset <br />Offset Using Straight Riser <br />Phil—TAa 6 <br />Threaded <br />Thrcadi <br />OFFSET <br />Offset Using Ball Float <br />TOTAL OFFSET <br />Not To Exceed 20 inches <br />1' to e` <br />B' \ 7 to <br />17 5/5' <br />Phil—rte M 6050 <br />Threaded Meet <br />Threaded Elbow <br />Threaded <br />Threaded Cap <br />WIC01) <br />Extractor or Tee <br />Threaded to <br />Rleer <br />or direclty Into tank <br />I I Vapor Riser or Fitting <br />threaded directly into <br />tank bung <br />Boll Float <br />Vent Volse <br />(OPTIONAL) <br />Note: This figure represents one instance where a vapor recovery riser has been offset in order to <br />construct a two-point Phase I vapor recovery system. The above figure illustrates an offset using a <br />90 -degree elbow. However, in some instances, elbows less than 90 degrees may be used. All <br />fittings and pipe nipples shall be 4 -inch diameter similar to those of the spill container and rotatable <br />Phase I adaptors in order to reduce back pressure during a gasoline delivery. <br />
The URL can be used to link to this page
Your browser does not support the video tag.