Laserfiche WebLink
s <br />0 <br />0 <br />SWRCB, January 2002 Page 2 -of Z <br />a SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With S ill/Overfill Containment Boxes D <br />Spill/Overfill Containment Boxes are Present, but were Not Tested D <br />Test Method Developed By: D Spill Bucket Manufacturer >Lndustry Standard D Professional Engineer <br />D Other (Specify) <br />Test Method Used: D Pressure D Vacuum 7f�iydrostatic <br />D Other (Spec) <br />Test Equipment Used: S C-0 pl <br />Equipment Resolution: <br />2ff =1 <br />Spill Box # Spill Box # <br />Spill Box # Spill Box # <br />Bucket Diameter. <br />/2,1/ 2 t/ <br />12-'( <br />Bucket Depth: <br />�.3 '' - 3 ` ' <br />' <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test:. <br />Is 1`� 11` <br />I Crtl/I 1 <br />..77 <br />Test Start Time: <br />$p(a 0 <br />Initial Reading (Rt): <br />• (0 1 <br />d <br />Test End Time: <br />,�Z Z / Z2 <br />Final Reading (RF): <br />W& 3 CJO <br />Test Duration: <br />r` <br />Change in Reading (RF -Rt): <br />.000 (o • O C <br />moo(' U <br />Pass/Fail Threshold or <br />Criteria: <br />C) - 0OZ <br />Q • O O'Z <br />Test Res UIt: <br />I "ass ❑Fail &&'Pass Fail <br />"-ass LiFail C1 ;Pass DFail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />