Laserfiche WebLink
SWRCB,January 2002 <br /> Page- 2-of 2 <br /> 9. SPILLlOVERFILL CONTAINMENT BOXES <br /> Facili isNot Equipped WithS ill/Overfill Containment Boxes 0 <br /> Spill/Overrill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: Cl Spill Bucket Manufacturer PNndustry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum <br /> Hydrostatic, <br /> 0 Other(Sped) <br /> Test Equipment Used: ZN CO y1 Equipment Resolution: <br /> 014 FPO; <br /> Spill Box h ls�7A Spill Box kR�L B Spill Box 9 Spill Boa R <br /> Bucket Diameter. <br /> Bucket Depth <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: J t h S yyi Yl <br /> Test Start Time: <br /> Initial Reading(P.4): It 3L S cf <br /> Test End Time: 103,3 1 <br /> 033 <br /> Final Reading(RF): <br /> Test Duration: .s rn j rs l S ✓Y1 i n s V>1 <br /> Change in Reading(R-Ri): p, OO <br /> Pass/Fail Threshold or <br /> Criteria: ® O O Z O O <br /> ?est3iesdtt: &Pass _Tail Eass 'OiFail " <br /> E - :.3:P.ass `nlFail S.0„P_ass iO:Fail <br /> Comments—(include infonnation o, re airs made rior to testing, and recommended fo llow-up for failed tests) <br /> - 0.c in rem ooc <br /> r .S Pis / l� <br />